zzzz-950219  
Ship/Platform:   Ships of Opportunity
Original Cruise ID:   [ Area EB ]

[ back to previous window ]  


* The stations below are sorted by date, then by time, and then by "Orig-Identifier".   As time over-rides the Orig-Identifier sequencing,
missing or incorrect times may create incorrect "Orig-Identifier" and/or station sorting.


* * B= Total Biomass, Z = Zooplankton, P = Phytoplankton
YYYY-MM-DD* Time (GMT)* Longitude Latitude Station
(Orig-Identifier*)
Station
(Parameter List**)
1995-02-19 19.45 -66.4150 40.9550  21 -Z-
1995-02-20 00.45 -65.7100 41.8017  15 --P
1995-02-20 00.45 -65.7100 41.8017  15 -Z-
1995-02-20 05.45 -64.9933 42.6483  9 --P
1995-02-20 05.45 -64.9933 42.6483  9 -Z-
1995-02-20 10.45 -64.2683 43.4967  3 --P
1995-02-20 10.45 -64.2683 43.4967  3 -Z-
1995-03-19 11.60 -69.4767 40.0467  33 --P
1995-03-19 11.60 -69.4767 40.0467  33 -Z-
1995-03-19 16.97 -68.3617 40.5700  27 --P
1995-03-19 16.97 -68.3617 40.5700  27 -ZP
1995-03-19 22.35 -67.2400 41.0917  21 --P
1995-03-19 22.35 -67.2400 41.0917  21 -Z-
1995-03-20 03.73 -66.1083 41.6150  15 --P
1995-03-20 03.73 -66.1083 41.6150  15 -Z-
1995-03-20 09.10 -64.9667 42.1367  9 --P
1995-03-20 09.10 -64.9667 42.1367  9 -ZP
1995-03-20 14.48 -63.8167 42.6600  3 --P
1995-03-20 14.48 -63.8167 42.6600  3 -ZP
1995-04-16 03.37 -69.3750 40.1133  33 -ZP
1995-04-16 08.18 -68.2683 40.6450  27 -Z-
1995-04-16 13.00 -67.1517 41.1767  21 --P
1995-04-16 13.00 -67.1517 41.1767  21 -ZP
1995-04-16 17.83 -66.0267 41.7083  15 --P
1995-04-16 17.83 -66.0267 41.7083  15 -ZP
1995-04-16 22.65 -64.8917 42.2400  9 --P
1995-04-16 22.65 -64.8917 42.2400  9 -Z-
1995-04-17 03.48 -63.7467 42.7717  3 --P
1995-04-17 03.48 -63.7467 42.7717  3 -ZP
1995-05-13 03.90 -68.5900 40.4867  33 --P
1995-05-13 03.90 -68.5900 40.4867  33 -ZP
1995-05-13 08.70 -67.4783 41.0217  27 --P
1995-05-13 08.70 -67.4783 41.0217  27 -Z-
1995-05-13 13.78 -66.5883 41.7650  21 --P
1995-05-13 13.78 -66.5883 41.7650  21 -Z-
1995-05-13 18.87 -65.6900 42.5067  15 --P
1995-05-13 18.87 -65.6900 42.5067  15 -Z-
1995-05-13 23.95 -64.7800 43.2500  9 --P
1995-05-13 23.95 -64.7800 43.2500  9 -ZP
1995-05-14 05.05 -63.8583 43.9933  3 --P
1995-05-14 05.05 -63.8583 43.9933  3 -Z-
1995-06-11 02.97 -69.5567 40.1783  33 --P
1995-06-11 02.97 -69.5567 40.1783  33 -ZP
1995-06-11 08.15 -68.4300 40.6883  27 --P
1995-06-11 08.15 -68.4300 40.6883  27 -Z-
1995-06-11 13.33 -67.2967 41.1983  21 --P
1995-06-11 13.33 -67.2967 41.1983  21 -ZP
1995-06-11 18.52 -66.1533 41.7100  15 --P
1995-06-11 18.52 -66.1533 41.7100  15 -Z-
1995-06-11 23.70 -65.0017 42.2200  9 -Z-
1995-06-12 04.88 -63.8400 42.7300  3 -Z-
1995-07-09 00.27 -69.3217 40.1083  33 --P
1995-07-09 00.27 -69.3217 40.1083  33 -Z-
1995-07-09 04.85 -68.2150 40.6417  27 --P
1995-07-09 04.85 -68.2150 40.6417  27 -Z-
1995-07-09 09.43 -67.1000 41.1733  21 -Z-
1995-07-09 14.02 -65.9750 41.7067  15 -Z-
1995-07-09 18.60 -64.8400 42.2383  9 -Z-
1995-07-09 23.18 -63.6967 42.7717  3 -Z-
1995-08-05 00.47 -69.4250 40.1033  33 --P
1995-08-05 00.47 -69.4250 40.1033  33 -ZP
1995-08-05 06.17 -68.3133 40.6300  27 --P
1995-08-05 06.17 -68.3133 40.6300  27 -Z-
1995-08-05 11.87 -67.1950 41.1583  21 --P
1995-08-05 11.87 -67.1950 41.1583  21 -ZP
1995-08-05 17.58 -66.0667 41.6850  15 --P
1995-08-05 17.58 -66.0667 41.6850  15 -ZP
1995-08-05 23.28 -64.9283 42.2133  9 -Z-
1995-08-06 05.00 -63.7800 42.7417  3 -Z-
1995-09-02 23.77 -69.6650 40.0083  33 --P
1995-09-02 23.77 -69.6650 40.0083  33 -ZP
1995-09-03 04.68 -68.5517 40.5317  27 --P
1995-09-03 04.68 -68.5517 40.5317  27 -ZP
1995-09-03 09.62 -67.4317 41.0550  21 --P
1995-09-03 09.62 -67.4317 41.0550  21 -Z-
1995-09-03 14.55 -66.3017 41.5783  15 --P
1995-09-03 14.55 -66.3017 41.5783  15 -Z-
1995-09-03 19.48 -65.1617 42.1033  9 --P
1995-09-03 19.48 -65.1617 42.1033  9 -ZP
1995-09-04 00.42 -64.0133 42.6267  3 -Z-
1995-10-29 04.07 -69.1467 40.2133  33 --P
1995-10-29 04.07 -69.1467 40.2133  33 -ZP
1995-10-29 08.95 -68.0350 40.7417  27 -Z-
1995-10-29 13.83 -66.9150 41.2717  21 --P
1995-10-29 13.83 -66.9150 41.2717  21 -ZP
1995-10-29 18.72 -65.7850 41.8000  15 --P
1995-10-29 18.72 -65.7850 41.8000  15 -ZP
1995-10-29 23.60 -64.6467 42.3283  9 --P
1995-10-29 23.60 -64.6467 42.3283  9 -ZP
1995-10-30 04.48 -63.4983 42.8567  3 -Z-
1995-11-26 11.95 -68.5683 40.4733  27 --P
1995-11-26 11.95 -68.5683 40.4733  27 -Z-
1995-11-26 18.60 -67.4383 40.9833  21 --P
1995-11-26 18.60 -67.4383 40.9833  21 -Z-
1995-11-27 01.27 -66.3000 41.4950  15 -Z-
1995-11-27 07.92 -65.1517 42.0067  9 -Z-
1995-11-27 14.58 -63.9950 42.5183  3 --P
1995-11-27 14.58 -63.9950 42.5183  3 -ZP
1995-12-24 01.22 -69.3583 40.1183  33 -Z-
1995-12-24 11.05 -67.1283 41.1733  21 -ZP
1995-12-24 15.95 -66.0000 41.7017  15 --P
1995-12-24 15.95 -66.0000 41.7017  15 -Z-
1995-12-24 20.87 -64.8617 42.2300  9 -Z-
1995-12-25 01.78 -63.7133 42.7583  3 --P
1995-12-25 01.78 -63.7133 42.7583  3 -Z-
1996-01-21 06.87 -69.3717 40.1100  33 --P
1996-01-21 06.87 -69.3717 40.1100  33 -Z-
1996-01-21 11.98 -68.2600 40.6367  27 --P
1996-01-21 11.98 -68.2600 40.6367  27 -Z-
1996-01-21 17.10 -67.1400 41.1633  21 --P
1996-01-21 17.10 -67.1400 41.1633  21 -Z-
1996-01-21 22.22 -66.0100 41.6900  15 --P
1996-01-21 22.22 -66.0100 41.6900  15 -Z-
1996-01-22 03.35 -64.8717 42.2167  9 --P
1996-01-22 03.35 -64.8717 42.2167  9 -Z-
1996-01-22 08.47 -63.7233 42.7450  3 -Z-
1996-02-18 19.67 -69.1917 40.2183  33 --P
1996-02-18 19.67 -69.1917 40.2183  33 -Z-
1996-02-19 00.35 -68.0800 40.7450  27 --P
1996-02-19 00.35 -68.0800 40.7450  27 -Z-
1996-02-19 05.05 -66.9583 41.2733  21 --P
1996-02-19 05.05 -66.9583 41.2733  21 -Z-
1996-02-19 09.73 -65.8267 41.8000  15 --P
1996-02-19 09.73 -65.8267 41.8000  15 -Z-
1996-02-19 19.12 -63.5367 42.8550  3 -Z-
1996-03-17 11.20 -69.1567 40.2267  33 --P
1996-03-17 11.20 -69.1567 40.2267  33 -Z-
1996-03-17 15.92 -68.0417 40.7533  27 --P
1996-03-17 15.92 -68.0417 40.7533  27 -ZP
1996-03-17 20.63 -66.9200 41.2800  21 --P
1996-03-17 20.63 -66.9200 41.2800  21 -Z-
1996-03-18 01.37 -65.7883 41.8050  15 --P
1996-03-18 01.37 -65.7883 41.8050  15 -Z-
1996-03-18 06.08 -64.6467 42.3317  9 --P
1996-03-18 06.08 -64.6467 42.3317  9 -Z-
1996-03-18 10.80 -63.4967 42.8583  3 --P
1996-03-18 10.80 -63.4967 42.8583  3 -ZP
1996-03-31 11.52 -68.4250 40.0400  33 --P
1996-03-31 11.52 -68.4250 40.0400  33 -ZP
1996-03-31 16.25 -67.2717 40.5083  27 --P
1996-03-31 16.25 -67.2717 40.5083  27 -Z-
1996-03-31 20.98 -66.1117 40.9783  21 --P
1996-03-31 20.98 -66.1117 40.9783  21 -ZP
1996-04-01 01.72 -64.9417 41.4467  15 --P
1996-04-01 01.72 -64.9417 41.4467  15 -Z-
1996-04-01 06.47 -63.7650 41.9167  9 --P
1996-04-01 06.47 -63.7650 41.9167  9 -ZP
1996-04-01 11.20 -62.5783 42.3867  3 --P
1996-04-01 11.20 -62.5783 42.3867  3 -ZP
1996-05-26 04.55 -68.9467 40.3000  33 --P
1996-05-26 04.55 -68.9467 40.3000  33 -Z-
1996-05-26 09.07 -67.8333 40.8283  27 -Z-
1996-05-26 13.57 -66.7100 41.3550  21 --P
1996-05-26 18.08 -65.5783 41.8833  15 -Z-
1996-05-26 22.60 -64.4367 42.4117  9 -ZP
1996-05-27 03.12 -63.2867 42.9383  3 --P
1996-05-27 03.12 -63.2867 42.9383  3 -ZP
1996-06-22 03.87 -68.6717 40.4267  33 --P
1996-06-22 03.87 -68.6717 40.4267  33 -ZP
1996-06-22 09.00 -67.5550 40.9533  27 --P
1996-06-22 09.00 -67.5550 40.9533  27 -ZP
1996-06-22 14.12 -66.4300 41.4800  21 -Z-
1996-06-22 19.25 -65.2950 42.0067  15 -ZP
1996-06-23 00.37 -64.1500 42.5333  9 -Z-
1996-06-23 05.50 -62.9950 43.0600  3 --P
1996-06-23 05.50 -62.9950 43.0600  3 -Z-
1996-07-21 21.48 -69.4300 40.0450  33 --P
1996-07-22 01.97 -68.3183 40.5717  27 --P
1996-07-22 01.97 -68.3183 40.5717  27 -Z-
1996-07-22 06.45 -67.1983 41.0967  21 -Z-
1996-07-22 10.93 -66.0700 41.6217  15 -ZP
1996-07-22 15.42 -64.9300 42.1483  9 --P
1996-09-15 11.48 -68.8317 40.2550  33 --P
1996-09-15 11.48 -68.8317 40.2550  33 -ZP
1996-09-15 15.75 -67.7250 40.7917  27 --P
1996-09-15 15.75 -67.7250 40.7917  27 -ZP
1996-09-15 20.03 -66.6117 41.3283  21 --P
1996-09-15 20.03 -66.6117 41.3283  21 -Z-
1996-09-16 00.30 -65.4867 41.8650  15 --P
1996-09-16 00.30 -65.4867 41.8650  15 -Z-
1996-09-16 04.58 -64.3533 42.4017  9 --P
1996-09-16 04.58 -64.3533 42.4017  9 -ZP
1996-09-16 08.87 -63.2100 42.9383  3 --P
1996-09-16 08.87 -63.2100 42.9383  3 -ZP
1996-10-12 21.90 -69.3950 40.0867  33 --P
1996-10-12 21.90 -69.3950 40.0867  33 -Z-
1996-10-13 02.28 -68.2850 40.6150  27 --P
1996-10-13 02.28 -68.2850 40.6150  27 -ZP
1996-10-13 06.67 -67.1667 41.1433  21 --P
1996-10-13 06.67 -67.1667 41.1433  21 -Z-
1996-10-13 11.05 -66.0383 41.6717  15 --P
1996-10-13 11.05 -66.0383 41.6717  15 -ZP
1996-10-13 15.42 -64.9017 42.2000  9 --P
1996-10-13 15.42 -64.9017 42.2000  9 -ZP
1996-10-13 19.80 -63.7550 42.7283  3 -Z-
1996-11-09 22.37 -69.3267 40.1267  33 --P
1996-11-09 22.37 -69.3267 40.1267  33 -Z-
1996-11-10 03.02 -68.2150 40.6533  27 --P
1996-11-10 07.68 -67.0950 41.1800  21 -Z-
1996-11-10 17.00 -64.8250 42.2333  9 --P
1996-11-10 21.67 -63.6767 42.7600  3 --P
1996-11-10 21.67 -63.6767 42.7600  3 -ZP
1996-12-07 07.00 -68.6917 40.4883  33 --P
1996-12-07 07.00 -68.6917 40.4883  33 -ZP
1996-12-07 12.77 -67.6350 41.0867  27 --P
1996-12-07 12.77 -67.6350 41.0867  27 -Z-
1996-12-07 18.52 -66.5700 41.6833  21 --P
1996-12-07 18.52 -66.5700 41.6833  21 -ZP
1996-12-08 00.28 -65.4950 42.2800  15 --P
1996-12-08 00.28 -65.4950 42.2800  15 -Z-
1996-12-08 06.05 -64.4083 42.8767  9 --P
1996-12-08 06.05 -64.4083 42.8767  9 -Z-
1996-12-08 11.80 -63.3117 43.4733  3 --P
1996-12-08 11.80 -63.3117 43.4733  3 -ZP
1997-01-05 04.32 -69.1683 40.2133  27 --P
1997-01-05 04.32 -69.1683 40.2133  27 -ZP
1997-01-05 07.50 -68.0550 40.7383  21 --P
1997-01-05 07.50 -68.0550 40.7383  21 -Z-
1997-01-05 12.15 -67.1317 41.4200  15 --P
1997-01-05 12.15 -67.1317 41.4200  15 -Z-
1997-01-05 18.25 -66.3917 42.2533  9 --P
1997-01-05 18.25 -66.3917 42.2533  9 -ZP
1997-01-06 00.35 -65.6433 43.0867  3 --P
1997-01-06 00.35 -65.6433 43.0867  3 -Z-
1997-01-31 23.98 -69.2517 40.1683  27 -Z-
1997-02-01 04.57 -68.1383 40.6933  21 --P
1997-02-01 04.57 -68.1383 40.6933  21 -Z-
1997-02-01 09.08 -67.1800 41.3467  15 -Z-
1997-02-01 13.50 -66.4433 42.1817  9 --P
1997-02-01 13.50 -66.4433 42.1817  9 -Z-
1997-02-01 17.93 -65.6967 43.0150  3 --P
1997-02-01 17.93 -65.6967 43.0150  3 -ZP
1997-03-02 03.73 -69.2983 40.1333  33 --P
1997-03-02 03.73 -69.2983 40.1333  33 -Z-
1997-03-02 08.08 -68.1850 40.6583  27 -Z-
1997-03-02 12.42 -67.0633 41.1833  21 --P
1997-03-02 12.42 -67.0633 41.1833  21 -Z-
1997-03-02 16.77 -65.9333 41.7100  15 --P
1997-03-02 16.77 -65.9333 41.7100  15 -Z-
1997-03-02 21.10 -64.7933 42.2350  9 --P
1997-03-02 21.10 -64.7933 42.2350  9 -ZP
1997-03-03 01.45 -63.6433 42.7600  3 --P
1997-03-03 01.45 -63.6433 42.7600  3 -ZP
1997-03-30 06.25 -69.3933 40.0750  33 --P
1997-03-30 06.25 -69.3933 40.0750  33 -Z-
1997-03-30 11.10 -68.2850 40.6050  27 --P
1997-03-30 11.10 -68.2850 40.6050  27 -Z-
1997-03-30 15.97 -67.1667 41.1350  21 --P
1997-03-30 15.97 -67.1667 41.1350  21 -Z-
1997-03-30 20.83 -66.0417 41.6650  15 --P
1997-03-30 20.83 -66.0417 41.6650  15 -Z-
1997-03-31 01.70 -64.9050 42.1950  9 --P
1997-03-31 01.70 -64.9050 42.1950  9 -Z-
1997-03-31 06.57 -63.7600 42.7250  3 --P
1997-03-31 06.57 -63.7600 42.7250  3 -Z-
1997-04-27 02.13 -69.2583 40.1683  33 --P
1997-04-27 02.13 -69.2583 40.1683  33 -Z-
1997-04-27 06.58 -68.1517 40.7017  27 -Z-
1997-04-27 11.05 -67.0350 41.2350  21 --P
1997-04-27 11.05 -67.0350 41.2350  21 -Z-
1997-04-27 15.52 -65.9100 41.7700  15 --P
1997-04-27 15.52 -65.9100 41.7700  15 -Z-
1997-04-27 19.97 -64.7767 42.3033  9 -ZP
1997-04-28 00.43 -63.6317 42.8367  3 --P
1997-04-28 00.43 -63.6317 42.8367  3 -Z-
1997-05-25 03.00 -68.9400 40.3167  33 -ZP
1997-05-25 07.40 -67.8250 40.8417  27 -ZP
1997-05-25 11.82 -66.7000 41.3667  21 --P
1997-05-25 11.82 -66.7000 41.3667  21 -Z-
1997-05-25 16.22 -65.5650 41.8917  15 -Z-
1997-05-25 20.63 -64.4217 42.4167  9 -ZP
1997-05-26 01.03 -63.2683 42.9417  3 -ZP
1997-06-22 02.97 -69.1233 40.1933  33 -Z-
1997-06-22 07.33 -68.0100 40.7200  27 --P
1997-06-22 07.33 -68.0100 40.7200  27 -Z-
1997-06-22 11.70 -66.8867 41.2467  21 --P
1997-06-22 11.70 -66.8867 41.2467  21 -Z-
1997-06-22 16.07 -65.7567 41.7733  15 --P
1997-06-22 16.07 -65.7567 41.7733  15 -Z-
1997-06-22 20.43 -64.6150 42.2983  9 --P
1997-06-22 20.43 -64.6150 42.2983  9 -Z-
1997-06-23 00.80 -63.4650 42.8250  3 -Z-
1997-07-19 09.90 -69.3533 40.0833  33 --P
1997-07-19 14.30 -68.2483 40.6183  27 --P
1997-07-19 14.30 -68.2483 40.6183  27 -Z-
1997-07-19 18.72 -67.1350 41.1533  21 -Z-
1997-07-19 23.13 -66.0133 41.6883  15 --P
1997-07-19 23.13 -66.0133 41.6883  15 -Z-
1997-07-20 07.97 -63.7383 42.7567  3 -Z-
1997-08-16 03.42 -67.7150 40.3483  27 --P
1997-08-16 03.42 -67.7150 40.3483  27 -ZP
1997-08-16 07.55 -66.5533 40.8117  21 -ZP
1997-08-16 11.67 -65.3817 41.2750  15 --P
1997-08-16 11.67 -65.3817 41.2750  15 -Z-
1997-08-16 19.93 -63.0167 42.2033  3 -Z-
1997-09-14 16.15 -64.9433 42.1500  9 -Z-
1997-09-14 20.70 -63.7967 42.6767  3 --P
1997-09-14 20.70 -63.7967 42.6767  3 -ZP
1997-10-12 11.85 -69.4000 40.0933  33 --P
1997-10-12 11.85 -69.4000 40.0933  33 -Z-
1997-10-12 16.52 -68.2833 40.6133  27 --P
1997-10-12 16.52 -68.2833 40.6133  27 -Z-
1997-10-12 21.18 -67.1583 41.1350  21 --P
1997-10-12 21.18 -67.1583 41.1350  21 -Z-
1997-10-13 01.85 -66.0250 41.6550  15 -Z-
1997-10-13 06.50 -64.8817 42.1750  9 --P
1997-10-13 06.50 -64.8817 42.1750  9 -ZP
1997-11-09 08.92 -69.2400 40.1517  33 --P
1997-11-09 08.92 -69.2400 40.1517  33 -ZP
1997-11-09 13.47 -68.1233 40.6733  27 --P
1997-11-09 13.47 -68.1233 40.6733  27 -Z-
1997-11-09 18.02 -66.9983 41.1950  21 -Z-
1997-11-09 22.57 -65.8650 41.7167  15 --P
1997-11-09 22.57 -65.8650 41.7167  15 -Z-
1997-11-10 03.12 -64.7217 42.2383  9 --P
1997-11-10 03.12 -64.7217 42.2383  9 -Z-
1997-11-10 07.67 -63.5683 42.7600  3 -Z-
1997-12-06 21.18 -69.3400 40.1050  33 -Z-
1997-12-07 01.55 -68.2317 40.6350  27 -Z-
1997-12-07 05.92 -67.1150 41.1667  21 -Z-
1997-12-07 10.28 -65.9883 41.6967  15 --P
1997-12-07 10.28 -65.9883 41.6967  15 -Z-
1997-12-07 14.67 -64.8533 42.2283  9 -Z-
1997-12-07 19.03 -63.7083 42.7583  3 -Z-
1998-01-03 22.88 -69.4183 40.0567  33 -Z-
1998-01-04 03.43 -68.3150 40.5933  27 -Z-
1998-01-04 08.00 -67.2033 41.1283  21 --P
1998-01-04 08.00 -67.2033 41.1283  21 -Z-
1998-01-04 12.57 -66.0817 41.6650  15 --P
1998-01-04 12.57 -66.0817 41.6650  15 -ZP
1998-01-04 17.12 -64.9517 42.2000  9 --P
1998-01-04 17.12 -64.9517 42.2000  9 -Z-
1998-01-04 21.68 -63.8117 42.7367  3 --P
1998-01-04 21.68 -63.8117 42.7367  3 -Z-
1998-02-01 07.35 -69.2983 40.1000  33 --P
1998-02-01 07.35 -69.2983 40.1000  33 -Z-
1998-02-01 13.23 -68.1883 40.6283  27 --P
1998-02-01 13.23 -68.1883 40.6283  27 -ZP
1998-02-01 19.12 -67.0700 41.1567  21 --P
1998-02-02 06.88 -64.8050 42.2150  9 --P
1998-02-02 06.88 -64.8050 42.2150  9 -Z-
1998-02-02 12.78 -63.6583 42.7433  3 --P
1998-02-02 12.78 -63.6583 42.7433  3 -Z-
1998-03-01 02.50 -69.5633 40.0217  33 --P
1998-03-01 02.50 -69.5633 40.0217  33 -Z-
1998-03-01 07.12 -68.4517 40.5483  27 --P
1998-03-01 07.12 -68.4517 40.5483  27 -Z-
1998-03-01 11.73 -67.3317 41.0733  21 --P
1998-03-01 11.73 -67.3317 41.0733  21 -ZP
1998-03-01 16.33 -66.2033 41.5983  15 --P
1998-03-01 16.33 -66.2033 41.5983  15 -Z-
1998-03-01 20.95 -65.0650 42.1233  9 --P
1998-03-01 20.95 -65.0650 42.1233  9 -ZP
1998-03-02 01.57 -63.9167 42.6500  3 --P
1998-03-02 01.57 -63.9167 42.6500  3 -Z-
1998-03-29 10.93 -69.0467 40.2167  33 --P
1998-03-29 10.93 -69.0467 40.2167  33 -Z-
1998-03-29 15.15 -67.9400 40.7517  27 --P
1998-03-29 15.15 -67.9400 40.7517  27 -Z-
1998-03-29 19.35 -66.8250 41.2867  21 --P
1998-03-29 19.35 -66.8250 41.2867  21 -Z-
1998-03-29 23.57 -65.7000 41.8217  15 --P
1998-03-29 23.57 -65.7000 41.8217  15 -Z-
1998-03-30 03.77 -64.5667 42.3567  9 --P
1998-03-30 03.77 -64.5667 42.3567  9 -ZP
1998-03-30 07.98 -63.4217 42.8917  3 --P
1998-03-30 07.98 -63.4217 42.8917  3 -Z-
1998-04-25 23.52 -69.4150 40.0683  33 --P
1998-04-25 23.52 -69.4150 40.0683  33 -Z-
1998-04-26 04.13 -68.3033 40.5933  27 --P
1998-04-26 04.13 -68.3033 40.5933  27 -ZP
1998-04-26 08.73 -67.1817 41.1183  21 --P
1998-04-26 08.73 -67.1817 41.1183  21 -ZP
1998-04-26 13.33 -66.0517 41.6433  15 --P
1998-04-26 13.33 -66.0517 41.6433  15 -Z-
1998-04-26 17.95 -64.9117 42.1683  9 --P
1998-04-26 17.95 -64.9117 42.1683  9 -ZP
1998-04-26 22.55 -63.7633 42.6933  3 --P
1998-04-26 22.55 -63.7633 42.6933  3 -ZP
1998-05-24 02.88 -69.1433 40.2367  33 -ZP
1998-05-24 07.23 -68.0283 40.7617  27 -Z-
1998-05-24 11.58 -66.9050 41.2867  21 --P
1998-05-24 11.58 -66.9050 41.2867  21 -ZP
1998-05-24 15.95 -65.7717 41.8117  15 -Z-
1998-05-24 20.30 -64.6283 42.3367  9 -Z-
1998-05-25 00.65 -63.4767 42.8617  3 --P
1998-05-25 00.65 -63.4767 42.8617  3 -ZP
1998-06-20 23.37 -69.6100 40.0317  33 --P
1998-06-20 23.37 -69.6100 40.0317  33 -Z-
1998-06-21 03.70 -68.4917 40.5483  27 --P
1998-06-21 03.70 -68.4917 40.5483  27 -ZP
1998-06-21 08.03 -67.3650 41.0650  21 --P
1998-06-21 08.03 -67.3650 41.0650  21 -Z-
1998-06-21 12.37 -66.2283 41.5817  15 --P
1998-06-21 12.37 -66.2283 41.5817  15 -ZP
1998-06-21 21.05 -63.9300 42.6150  3 --P
1998-06-21 21.05 -63.9300 42.6150  3 -Z-
1998-07-19 04.58 -67.3183 41.0317  45 --P
1998-07-19 04.58 -67.3183 41.0317  45 -Z-
1998-07-19 08.90 -66.1900 41.5583  39 --P
1998-07-19 08.90 -66.1900 41.5583  39 -ZP
1998-07-19 21.88 -62.7483 43.1333  21 --P
1998-07-19 21.88 -62.7483 43.1333  21 -ZP
1998-07-20 02.20 -61.5800 43.6583  15 --P
1998-07-20 02.20 -61.5800 43.6583  15 -ZP
1998-07-20 06.53 -60.4033 44.1833  9 --P
1998-07-20 06.53 -60.4033 44.1833  9 -Z-
1998-07-20 10.85 -59.2150 44.7083  3 --P
1998-07-20 10.85 -59.2150 44.7083  3 -Z-
1998-08-15 23.95 -68.7617 40.1433  33 --P
1998-08-15 23.95 -68.7617 40.1433  33 -ZP
1998-08-16 04.15 -67.6617 40.6850  27 --P
1998-08-16 04.15 -67.6617 40.6850  27 -ZP
1998-08-16 08.35 -66.5533 41.2267  21 --P
1998-08-16 08.35 -66.5533 41.2267  21 -ZP
1998-08-16 12.55 -65.4367 41.7683  15 -ZP
1998-08-16 16.75 -64.3083 42.3100  9 -Z-
1998-08-16 20.95 -63.1717 42.8533  3 -ZP
1998-09-13 00.77 -67.7567 40.4633  27 -Z-
1998-09-13 04.92 -66.6033 40.9433  21 --P
1998-09-13 04.92 -66.6033 40.9433  21 -ZP
1998-09-13 09.20 -65.5317 41.5283  15 --P
1998-09-13 09.20 -65.5317 41.5283  15 -ZP
1998-09-13 13.52 -64.4617 42.1267  9 --P
1998-09-13 13.52 -64.4617 42.1267  9 -ZP
1998-09-13 17.83 -63.3800 42.7267  3 -Z-
1998-10-11 04.05 -68.8300 40.0250  33 -Z-
1998-10-11 08.50 -67.6850 40.5050  27 --P
1998-10-11 08.50 -67.6850 40.5050  27 -Z-
1998-10-11 12.95 -66.5317 40.9867  21 --P
1998-10-11 12.95 -66.5317 40.9867  21 -Z-
1998-10-11 17.83 -65.4400 41.5533  15 --P
1998-10-11 17.83 -65.4400 41.5533  15 -ZP
1998-10-11 22.75 -64.3400 42.1217  9 --P
1998-10-11 22.75 -64.3400 42.1217  9 -ZP
1998-10-12 03.65 -63.2300 42.6900  3 --P
1998-10-12 03.65 -63.2300 42.6900  3 -ZP
1998-11-08 03.50 -68.5850 40.1950  27 --P
1998-11-08 03.50 -68.5850 40.1950  27 -ZP
1998-11-08 08.08 -67.4417 40.6817  21 --P
1998-11-08 08.08 -67.4417 40.6817  21 -ZP
1998-11-08 12.65 -66.3117 41.1933  15 --P
1998-11-08 12.65 -66.3117 41.1933  15 -ZP
1998-11-08 17.17 -65.2417 41.7867  9 --P
1998-11-08 17.17 -65.2417 41.7867  9 -Z-
1998-11-08 21.70 -64.1617 42.3800  3 --P
1998-11-08 21.70 -64.1617 42.3800  3 -Z-
1998-12-06 01.02 -68.6950 40.4883  27 --P
1998-12-06 01.02 -68.6950 40.4883  27 -ZP
1998-12-06 05.22 -67.5800 41.0183  21 -Z-
1998-12-06 09.42 -66.4550 41.5483  15 --P
1998-12-06 09.42 -66.4550 41.5483  15 -ZP
1998-12-06 13.63 -65.3217 42.0767  9 --P
1998-12-06 13.63 -65.3217 42.0767  9 -Z-
1998-12-06 17.83 -64.1783 42.6067  3 -Z-
1999-01-01 20.85 -69.1833 40.0250  33 --P
1999-01-01 20.85 -69.1833 40.0250  33 -Z-
1999-01-02 01.67 -68.0050 40.4550  27 --P
1999-01-02 01.67 -68.0050 40.4550  27 -ZP
1999-01-02 06.48 -66.8183 40.8850  21 --P
1999-01-02 06.48 -66.8183 40.8850  21 -Z-
1999-01-02 11.12 -65.7067 41.4200  15 --P
1999-01-02 15.68 -64.6133 41.9950  9 --P
1999-01-02 20.25 -63.5117 42.5683  3 --P
1999-01-02 20.25 -63.5117 42.5683  3 -Z-
1999-02-01 07.55 -68.7483 40.0967  21 --P
1999-02-01 07.55 -68.7483 40.0967  21 -Z-
1999-02-01 12.18 -67.8267 40.8067  15 --P
1999-02-01 16.82 -66.9167 41.5300  9 --P
1999-02-01 16.82 -66.9167 41.5300  9 -ZP
1999-02-01 21.48 -66.2100 42.3800  3 --P
1999-02-01 21.48 -66.2100 42.3800  3 -Z-
1999-02-28 04.78 -68.7217 41.2300  21 --P
1999-02-28 04.78 -68.7217 41.2300  21 -Z-
1999-02-28 09.45 -67.7300 41.8967  15 --P
1999-02-28 09.45 -67.7300 41.8967  15 -Z-
1999-02-28 14.13 -66.7267 42.5633  9 --P
1999-02-28 14.13 -66.7267 42.5633  9 -Z-
1999-02-28 18.82 -65.7133 43.2317  3 --P
1999-02-28 18.82 -65.7133 43.2317  3 -Z-
1999-03-28 17.70 -69.0367 40.0617  27 --P
1999-03-28 17.70 -69.0367 40.0617  27 -ZP
1999-03-28 22.58 -67.8683 40.5100  21 --P
1999-03-28 22.58 -67.8683 40.5100  21 -ZP
1999-03-29 03.27 -67.0867 41.2833  15 --P
1999-03-29 03.27 -67.0867 41.2833  15 -Z-
1999-03-29 07.90 -66.3933 42.1367  9 --P
1999-03-29 07.90 -66.3933 42.1367  9 -ZP
1999-03-29 12.52 -65.6917 42.9917  3 --P
1999-03-29 12.52 -65.6917 42.9917  3 -ZP
1999-04-25 02.68 -68.6900 40.0217  33 --P
1999-04-25 02.68 -68.6900 40.0217  33 -ZP
1999-04-25 06.35 -67.5633 40.5267  27 --P
1999-04-25 06.35 -67.5633 40.5267  27 -Z-
1999-04-25 10.02 -66.4267 41.0317  21 --P
1999-04-25 10.02 -66.4267 41.0317  21 -Z-
1999-04-25 15.03 -65.3017 41.5600  15 --P
1999-04-25 15.03 -65.3017 41.5600  15 -ZP
1999-04-25 21.05 -64.1817 42.1050  9 --P
1999-04-25 21.05 -64.1817 42.1050  9 -ZP
1999-04-26 03.08 -63.0517 42.6517  3 --P
1999-04-26 03.08 -63.0517 42.6517  3 -ZP
1999-05-22 21.13 -68.4333 40.1800  27 -Z-
1999-05-23 00.90 -67.2850 40.6600  21 --P
1999-05-23 00.90 -67.2850 40.6600  21 -Z-
1999-05-23 04.67 -66.3400 41.2750  15 --P
1999-05-23 04.67 -66.3400 41.2750  15 -Z-
1999-05-23 08.43 -65.9017 42.2200  9 -Z-
1999-05-23 12.20 -65.4567 43.1650  3 --P
1999-05-23 12.20 -65.4567 43.1650  3 -Z-
1999-06-19 20.48 -69.2633 40.1517  27 --P
1999-06-19 20.48 -69.2633 40.1517  27 -ZP
1999-06-20 00.45 -68.1783 40.7117  21 --P
1999-06-20 00.45 -68.1783 40.7117  21 -Z-
1999-06-20 04.08 -67.2500 41.3983  15 --P
1999-06-20 04.08 -67.2500 41.3983  15 -ZP
1999-06-20 07.35 -66.4850 42.2183  9 --P
1999-06-20 07.35 -66.4850 42.2183  9 -Z-
1999-06-20 10.63 -65.7100 43.0383  3 --P
1999-06-20 10.63 -65.7100 43.0383  3 -ZP
1999-07-17 18.57 -69.2133 40.2517  27 --P
1999-07-17 18.57 -69.2133 40.2517  27 -ZP
1999-07-17 22.37 -68.1017 40.7800  21 --P
1999-07-17 22.37 -68.1017 40.7800  21 -Z-
1999-07-18 02.18 -67.1883 41.4750  15 --P
1999-07-18 02.18 -67.1883 41.4750  15 -ZP
1999-07-18 05.98 -66.4167 42.2917  9 --P
1999-07-18 05.98 -66.4167 42.2917  9 -ZP
1999-07-18 09.80 -65.6333 43.1083  3 --P
1999-07-18 09.80 -65.6333 43.1083  3 -ZP
1999-08-14 17.88 -69.6700 40.4983  27 --P
1999-08-14 17.88 -69.6700 40.4983  27 -ZP
1999-08-14 22.13 -68.7000 41.1750  21 --P
1999-08-14 22.13 -68.7000 41.1750  21 -Z-
1999-08-15 02.40 -67.7217 41.8517  15 --P
1999-08-15 02.40 -67.7217 41.8517  15 -Z-
1999-08-15 06.67 -66.7317 42.5283  9 --P
1999-08-15 06.67 -66.7317 42.5283  9 -Z-
1999-08-15 10.93 -65.7300 43.2050  3 --P
1999-08-15 10.93 -65.7300 43.2050  3 -Z-
1999-09-11 19.40 -69.1083 40.2800  27 --P
1999-09-11 19.40 -69.1083 40.2800  27 -ZP
1999-09-11 23.72 -67.9967 40.8117  21 -ZP
1999-09-12 04.08 -67.1200 41.5333  15 --P
1999-09-12 04.08 -67.1200 41.5333  15 -Z-
1999-09-12 08.48 -66.3667 42.3600  9 --P
1999-09-12 08.48 -66.3667 42.3600  9 -ZP
1999-09-12 12.88 -65.6033 43.1867  3 -ZP
1999-10-09 12.47 -69.3967 40.4350  27 --P
1999-10-09 12.47 -69.3967 40.4350  27 -ZP
1999-10-09 16.55 -68.4900 41.1600  21 --P
1999-10-09 16.55 -68.4900 41.1600  21 -ZP
1999-10-09 20.63 -67.5750 41.8867  15 --P
1999-10-09 20.63 -67.5750 41.8867  15 -Z-
1999-10-10 00.72 -66.6483 42.6117  9 --P
1999-10-10 00.72 -66.6483 42.6117  9 -ZP
1999-10-10 04.80 -65.7117 43.3367  3 --P
1999-10-10 04.80 -65.7117 43.3367  3 -Z-
1999-11-06 17.72 -69.3283 40.1933  27 --P
1999-11-06 17.72 -69.3283 40.1933  27 -Z-
1999-11-06 21.70 -68.2117 40.7150  21 --P
1999-11-06 21.70 -68.2117 40.7150  21 -ZP
1999-11-07 01.98 -67.2633 41.3817  15 --P
1999-11-07 01.98 -67.2633 41.3817  15 -ZP
1999-11-07 06.58 -66.4967 42.2000  9 --P
1999-11-07 06.58 -66.4967 42.2000  9 -ZP
1999-11-07 11.20 -65.7183 43.0183  3 --P
1999-11-07 11.20 -65.7183 43.0183  3 -ZP
1999-12-05 19.50 -69.3750 40.1683  27 -Z-
1999-12-05 23.12 -68.2667 40.6983  21 -Z-
1999-12-06 02.72 -67.3000 41.3517  15 -Z-
1999-12-06 06.28 -66.5217 42.1650  9 --P
1999-12-06 06.28 -66.5217 42.1650  9 -ZP
1999-12-06 09.83 -65.7317 42.9767  3 -Z-
Sub-Collection:   North Atlantic CPR sample data. COPEPOD
https://www.st.nmfs.noaa.gov/copepod
Web v10.1   [ 2010-Dec ]