zzzz-950222  
Ship/Platform:   Ships of Opportunity
Original Cruise ID:   [ Area EA ]

[ back to previous window ]  


* The stations below are sorted by date, then by time, and then by "Orig-Identifier".   As time over-rides the Orig-Identifier sequencing,
missing or incorrect times may create incorrect "Orig-Identifier" and/or station sorting.


* * B= Total Biomass, Z = Zooplankton, P = Phytoplankton
YYYY-MM-DD* Time (GMT)* Longitude Latitude Station
(Orig-Identifier*)
Station
(Parameter List**)
1995-02-22 04.22 -62.5183 44.6633  39 --P
1995-02-22 04.22 -62.5183 44.6633  39 -Z-
1995-02-22 09.57 -61.2000 45.0117  33 --P
1995-02-22 09.57 -61.2000 45.0117  33 -Z-
1995-02-22 14.90 -59.8750 45.3583  27 --P
1995-02-22 14.90 -59.8750 45.3583  27 -Z-
1995-02-22 20.25 -58.5417 45.7067  21 --P
1995-02-22 20.25 -58.5417 45.7067  21 -Z-
1995-02-23 01.58 -57.1983 46.0550  15 --P
1995-02-23 01.58 -57.1983 46.0550  15 -ZP
1995-02-23 06.93 -55.8483 46.4033  9 --P
1995-02-23 06.93 -55.8483 46.4033  9 -Z-
1995-02-23 12.77 -54.5800 46.8467  3 --P
1995-02-23 12.77 -54.5800 46.8467  3 -Z-
1995-03-20 21.67 -62.1283 43.4467  39 --P
1995-03-20 21.67 -62.1283 43.4467  39 -Z-
1995-03-21 02.33 -60.9700 43.9883  33 --P
1995-03-21 02.33 -60.9700 43.9883  33 -ZP
1995-03-21 07.00 -59.8017 44.5317  27 --P
1995-03-21 07.00 -59.8017 44.5317  27 -ZP
1995-03-21 11.67 -58.6217 45.0733  21 --P
1995-03-21 11.67 -58.6217 45.0733  21 -Z-
1995-03-21 16.33 -57.4300 45.6167  15 --P
1995-03-21 16.33 -57.4300 45.6167  15 -Z-
1995-03-21 21.00 -56.2267 46.1583  9 --P
1995-03-21 21.00 -56.2267 46.1583  9 -Z-
1995-03-22 01.68 -55.0117 46.7017  3 --P
1995-03-22 01.68 -55.0117 46.7017  3 -ZP
1995-04-17 10.03 -62.1583 43.4750  39 --P
1995-04-17 10.03 -62.1583 43.4750  39 -ZP
1995-04-17 14.82 -60.9817 43.9967  33 --P
1995-04-17 14.82 -60.9817 43.9967  33 -ZP
1995-04-17 19.60 -59.7950 44.5200  27 --P
1995-04-17 19.60 -59.7950 44.5200  27 -ZP
1995-04-18 00.38 -58.5983 45.0417  21 --P
1995-04-18 00.38 -58.5983 45.0417  21 -ZP
1995-04-18 05.17 -57.3900 45.5633  15 --P
1995-04-18 05.17 -57.3900 45.5633  15 -Z-
1995-04-18 09.95 -56.1700 46.0867  9 --P
1995-04-18 09.95 -56.1700 46.0867  9 -ZP
1995-05-15 16.33 -62.4517 44.6117  39 --P
1995-05-15 16.33 -62.4517 44.6117  39 -ZP
1995-05-15 21.35 -61.1417 44.9717  33 --P
1995-05-15 21.35 -61.1417 44.9717  33 -ZP
1995-05-16 02.38 -59.8233 45.3317  27 --P
1995-05-16 02.38 -59.8233 45.3317  27 -ZP
1995-05-16 07.40 -58.4967 45.6917  21 --P
1995-05-16 07.40 -58.4967 45.6917  21 -Z-
1995-05-16 12.43 -57.1600 46.0517  15 --P
1995-05-16 12.43 -57.1600 46.0517  15 -ZP
1995-05-16 17.45 -55.8167 46.4117  9 --P
1995-05-16 17.45 -55.8167 46.4117  9 -ZP
1995-05-16 22.42 -54.5433 46.8400  3 --P
1995-05-16 22.42 -54.5433 46.8400  3 -ZP
1995-06-12 12.65 -61.9917 43.5800  39 --P
1995-06-12 12.65 -61.9917 43.5800  39 -ZP
1995-06-12 17.38 -60.8333 44.1250  33 --P
1995-06-12 17.38 -60.8333 44.1250  33 -Z-
1995-06-12 22.12 -59.6633 44.6700  27 --P
1995-06-12 22.12 -59.6633 44.6700  27 -Z-
1995-06-13 02.87 -58.4817 45.2133  21 --P
1995-06-13 02.87 -58.4817 45.2133  21 -Z-
1995-06-13 07.60 -57.2900 45.7583  15 --P
1995-06-13 07.60 -57.2900 45.7583  15 -Z-
1995-06-13 12.35 -56.0850 46.3033  9 --P
1995-06-13 12.35 -56.0850 46.3033  9 -Z-
1995-06-13 17.10 -54.8683 46.8467  3 --P
1995-06-13 17.10 -54.8683 46.8467  3 -Z-
1995-07-10 05.88 -62.0433 43.5467  39 -Z-
1995-07-10 10.43 -60.8817 44.0900  33 --P
1995-07-10 10.43 -60.8817 44.0900  33 -ZP
1995-07-10 14.98 -59.7117 44.6317  27 -Z-
1995-07-10 19.53 -58.5283 45.1733  21 -Z-
1995-07-11 00.10 -57.3350 45.7167  15 -Z-
1995-07-11 04.65 -56.1300 46.2583  9 -Z-
1995-07-11 09.20 -54.9133 46.8017  3 -Z-
1995-08-06 13.70 -61.9867 43.5500  39 --P
1995-08-06 13.70 -61.9867 43.5500  39 -ZP
1995-08-06 19.25 -60.8083 44.0733  33 --P
1995-08-06 19.25 -60.8083 44.0733  33 -Z-
1995-08-07 00.78 -59.6217 44.5950  27 -Z-
1995-08-07 17.42 -55.9917 46.1633  9 --P
1995-08-07 17.42 -55.9917 46.1633  9 -Z-
1995-08-07 22.97 -54.7617 46.6883  3 -Z-
1995-09-04 04.23 -63.1433 43.0300  45 --P
1995-09-04 04.23 -63.1433 43.0300  45 -ZP
1995-09-04 09.10 -61.9967 43.5750  39 --P
1995-09-04 09.10 -61.9967 43.5750  39 -ZP
1995-09-04 13.95 -60.8383 44.1217  33 -ZP
1995-09-04 18.80 -59.6700 44.6667  27 -ZP
1995-09-04 23.65 -58.4900 45.2117  21 --P
1995-09-04 23.65 -58.4900 45.2117  21 -ZP
1995-09-05 04.52 -57.2983 45.7583  15 -ZP
1995-09-05 09.37 -56.0950 46.3033  9 --P
1995-09-05 09.37 -56.0950 46.3033  9 -ZP
1995-09-05 14.23 -54.8800 46.8500  3 --P
1995-09-05 14.23 -54.8800 46.8500  3 -ZP
1995-10-30 12.07 -61.8217 43.8267  39 -Z-
1995-10-30 16.85 -60.8133 44.5150  33 --P
1995-10-30 16.85 -60.8133 44.5150  33 -ZP
1995-10-30 21.65 -59.7933 45.2033  27 --P
1995-10-30 21.65 -59.7933 45.2033  27 -Z-
1995-10-31 02.82 -58.5417 45.6750  21 --P
1995-10-31 02.82 -58.5417 45.6750  21 -ZP
1995-10-31 07.98 -57.2717 46.1350  15 --P
1995-10-31 13.17 -55.9883 46.5950  9 --P
1995-10-31 13.17 -55.9883 46.5950  9 -ZP
1995-10-31 18.35 -54.6950 47.0567  3 --P
1995-10-31 18.35 -54.6950 47.0567  3 -ZP
1995-11-27 14.68 -63.2367 42.8750  45 --P
1995-11-27 14.68 -63.2367 42.8750  45 -ZP
1995-11-27 19.95 -62.0833 43.4117  39 -Z-
1995-11-28 01.23 -60.9200 43.9467  33 --P
1995-11-28 01.23 -60.9200 43.9467  33 -Z-
1995-11-28 06.50 -59.7450 44.4817  27 -Z-
1995-11-28 11.78 -58.5600 45.0183  21 -Z-
1995-11-28 17.07 -57.3633 45.5533  15 --P
1995-11-28 17.07 -57.3633 45.5533  15 -Z-
1995-11-28 22.35 -56.1567 46.0900  9 --P
1995-11-28 22.35 -56.1567 46.0900  9 -ZP
1995-11-29 03.62 -54.9367 46.6250  3 --P
1995-11-29 03.62 -54.9367 46.6250  3 -ZP
1995-12-25 08.95 -62.0383 43.5417  39 --P
1995-12-25 08.95 -62.0383 43.5417  39 -Z-
1995-12-25 13.88 -60.8783 44.0850  33 --P
1995-12-25 13.88 -60.8783 44.0850  33 -ZP
1995-12-25 18.80 -59.7083 44.6283  27 --P
1995-12-25 18.80 -59.7083 44.6283  27 -ZP
1995-12-25 23.73 -58.5267 45.1717  21 --P
1995-12-25 23.73 -58.5267 45.1717  21 -ZP
1995-12-26 04.67 -57.3333 45.7150  15 --P
1995-12-26 04.67 -57.3333 45.7150  15 -Z-
1995-12-26 09.60 -56.1300 46.2567  9 --P
1995-12-26 09.60 -56.1300 46.2567  9 -ZP
1995-12-26 14.53 -54.9133 46.8000  3 --P
1995-12-26 14.53 -54.9133 46.8000  3 -ZP
1996-01-22 15.90 -61.9617 43.5800  39 --P
1996-01-22 15.90 -61.9617 43.5800  39 -Z-
1996-01-22 20.58 -60.8033 44.1250  33 --P
1996-01-23 01.27 -59.6333 44.6700  27 --P
1996-01-23 01.27 -59.6333 44.6700  27 -ZP
1996-01-23 05.95 -58.4533 45.2150  21 --P
1996-01-23 10.63 -57.2617 45.7617  15 --P
1996-01-23 10.63 -57.2617 45.7617  15 -ZP
1996-01-23 15.32 -56.0583 46.3067  9 --P
1996-01-23 20.00 -54.8417 46.8517  3 --P
1996-01-23 20.00 -54.8417 46.8517  3 -ZP
1996-02-20 02.37 -61.7233 43.6550  39 --P
1996-02-20 02.37 -61.7233 43.6550  39 -Z-
1996-02-20 07.03 -60.5433 44.1767  33 --P
1996-02-20 07.03 -60.5433 44.1767  33 -Z-
1996-02-20 11.72 -59.3517 44.6967  27 --P
1996-02-20 11.72 -59.3517 44.6967  27 -Z-
1996-02-20 16.40 -58.1500 45.2183  21 --P
1996-02-20 16.40 -58.1500 45.2183  21 -Z-
1996-02-20 21.08 -56.9367 45.7400  15 --P
1996-02-20 21.08 -56.9367 45.7400  15 -ZP
1996-02-21 01.75 -55.7133 46.2617  9 --P
1996-02-21 01.75 -55.7133 46.2617  9 -Z-
1996-02-21 06.37 -54.5833 46.8650  3 --P
1996-02-21 06.37 -54.5833 46.8650  3 -ZP
1996-03-18 18.62 -61.7383 43.6983  39 --P
1996-03-18 18.62 -61.7383 43.6983  39 -ZP
1996-03-18 23.87 -60.5867 44.2533  33 --P
1996-03-18 23.87 -60.5867 44.2533  33 -ZP
1996-03-19 05.10 -59.4233 44.8083  27 --P
1996-03-19 05.10 -59.4233 44.8083  27 -ZP
1996-03-19 10.35 -58.2500 45.3650  21 --P
1996-03-19 10.35 -58.2500 45.3650  21 -Z-
1996-03-19 15.58 -57.0633 45.9200  15 --P
1996-03-19 15.58 -57.0633 45.9200  15 -Z-
1996-03-19 20.83 -55.8667 46.4750  9 --P
1996-03-19 20.83 -55.8667 46.4750  9 -Z-
1996-03-20 02.08 -54.6567 47.0300  3 --P
1996-03-20 02.08 -54.6567 47.0300  3 -ZP
1996-04-01 17.57 -60.9650 43.0117  39 --P
1996-04-01 17.57 -60.9650 43.0117  39 -ZP
1996-04-01 22.37 -59.7600 43.4850  33 --P
1996-04-01 22.37 -59.7600 43.4850  33 -ZP
1996-04-02 03.03 -58.6967 44.1133  27 --P
1996-04-02 03.03 -58.6967 44.1133  27 -ZP
1996-04-02 07.63 -57.6700 44.7917  21 --P
1996-04-02 07.63 -57.6700 44.7917  21 -ZP
1996-04-02 12.25 -56.6317 45.4683  15 --P
1996-04-02 12.25 -56.6317 45.4683  15 -ZP
1996-04-02 16.87 -55.5800 46.1467  9 --P
1996-04-02 16.87 -55.5800 46.1467  9 -Z-
1996-04-02 21.45 -54.5433 46.8400  3 --P
1996-04-02 21.45 -54.5433 46.8400  3 -ZP
1996-05-27 09.35 -61.7283 43.6833  39 --P
1996-05-27 09.35 -61.7283 43.6833  39 -Z-
1996-05-27 13.85 -60.5783 44.2400  33 --P
1996-05-27 13.85 -60.5783 44.2400  33 -ZP
1996-05-27 18.33 -59.4183 44.7983  27 --P
1996-05-27 18.33 -59.4183 44.7983  27 -Z-
1996-05-27 22.83 -58.2467 45.3550  21 -ZP
1996-05-28 03.33 -57.0633 45.9133  15 --P
1996-05-28 03.33 -57.0633 45.9133  15 -Z-
1996-05-28 07.83 -55.8667 46.4700  9 --P
1996-05-28 07.83 -55.8667 46.4700  9 -Z-
1996-05-28 12.33 -54.6600 47.0267  3 --P
1996-05-28 12.33 -54.6600 47.0267  3 -Z-
1996-06-23 11.05 -61.6817 43.6483  39 --P
1996-06-23 11.05 -61.6817 43.6483  39 -Z-
1996-06-23 15.55 -60.5033 44.1717  33 --P
1996-06-23 15.55 -60.5033 44.1717  33 -ZP
1996-06-24 00.55 -58.1150 45.2200  21 -ZP
1996-06-24 05.05 -56.9033 45.7433  15 -Z-
1996-06-24 09.57 -55.6817 46.2683  9 -Z-
1996-06-24 14.32 -54.5483 46.8667  3 -Z-
1996-07-23 03.43 -61.8433 43.5900  39 -Z-
1996-07-23 07.83 -60.6900 44.1417  33 -Z-
1996-07-23 12.25 -59.5267 44.6933  27 -Z-
1996-07-23 16.65 -58.3517 45.2450  21 -Z-
1996-07-23 21.07 -57.1650 45.7967  15 -Z-
1996-07-24 01.47 -55.9667 46.3483  9 --P
1996-07-24 01.47 -55.9667 46.3483  9 -Z-
1996-07-24 05.88 -54.7550 46.8983  3 -ZP
1996-09-16 15.18 -61.5250 43.7150  39 --P
1996-09-16 15.18 -61.5250 43.7150  39 -ZP
1996-09-16 19.52 -60.3467 44.2417  33 -Z-
1996-09-16 23.85 -59.1583 44.7667  27 --P
1996-09-16 23.85 -59.1583 44.7667  27 -ZP
1996-09-17 04.18 -57.9583 45.2917  21 --P
1996-09-17 04.18 -57.9583 45.2917  21 -ZP
1996-09-17 08.52 -56.7467 45.8183  15 --P
1996-09-17 08.52 -56.7467 45.8183  15 -ZP
1996-09-17 12.85 -55.5250 46.3433  9 --P
1996-09-17 12.85 -55.5250 46.3433  9 -ZP
1996-09-17 16.77 -54.4250 46.9717  3 --P
1996-09-17 16.77 -54.4250 46.9717  3 -ZP
1996-10-13 23.20 -62.8333 43.1283  45 --P
1996-10-13 23.20 -62.8333 43.1283  45 -ZP
1996-10-14 03.47 -61.6700 43.6567  39 --P
1996-10-14 03.47 -61.6700 43.6567  39 -ZP
1996-10-14 07.73 -60.4950 44.1850  33 --P
1996-10-14 07.73 -60.4950 44.1850  33 -ZP
1996-10-14 12.00 -59.3100 44.7133  27 --P
1996-10-14 12.00 -59.3100 44.7133  27 -ZP
1996-10-14 16.25 -58.1133 45.2417  21 --P
1996-10-14 16.25 -58.1133 45.2417  21 -ZP
1996-10-14 20.52 -56.9050 45.7700  15 --P
1996-10-14 20.52 -56.9050 45.7700  15 -ZP
1996-10-15 00.78 -55.6867 46.2983  9 --P
1996-10-15 00.78 -55.6867 46.2983  9 -ZP
1996-10-15 05.17 -54.5100 46.8667  3 --P
1996-10-15 05.17 -54.5100 46.8667  3 -ZP
1996-11-11 01.38 -62.7350 43.1867  45 --P
1996-11-11 01.38 -62.7350 43.1867  45 -ZP
1996-11-11 05.82 -61.5650 43.7100  39 --P
1996-11-11 05.82 -61.5650 43.7100  39 -Z-
1996-11-11 10.27 -60.3850 44.2317  33 --P
1996-11-11 10.27 -60.3850 44.2317  33 -Z-
1996-11-11 14.72 -59.1933 44.7550  27 --P
1996-11-11 14.72 -59.1933 44.7550  27 -ZP
1996-11-11 19.17 -57.9917 45.2783  21 --P
1996-11-11 19.17 -57.9917 45.2783  21 -ZP
1996-11-11 23.62 -56.7800 45.8000  15 --P
1996-11-11 23.62 -56.7800 45.8000  15 -ZP
1996-11-12 04.07 -55.5550 46.3233  9 --P
1996-11-12 04.07 -55.5550 46.3233  9 -ZP
1996-11-12 08.45 -54.4550 46.9500  3 --P
1996-11-12 08.45 -54.4550 46.9500  3 -Z-
1996-12-08 18.65 -61.9117 43.6400  39 --P
1996-12-08 18.65 -61.9117 43.6400  39 -ZP
1996-12-09 00.15 -60.7250 44.1533  33 --P
1996-12-09 00.15 -60.7250 44.1533  33 -ZP
1996-12-09 05.65 -59.5267 44.6667  27 --P
1996-12-09 05.65 -59.5267 44.6667  27 -ZP
1996-12-09 11.17 -58.3200 45.1800  21 --P
1996-12-09 11.17 -58.3200 45.1800  21 -ZP
1996-12-09 16.67 -57.1000 45.6933  15 --P
1996-12-09 16.67 -57.1000 45.6933  15 -ZP
1996-12-09 22.18 -55.8700 46.2067  9 --P
1996-12-09 22.18 -55.8700 46.2067  9 -ZP
1996-12-10 03.60 -54.6750 46.7567  3 --P
1996-12-10 03.60 -54.6750 46.7567  3 -ZP
1997-01-06 17.38 -63.5750 44.1917  39 --P
1997-01-06 17.38 -63.5750 44.1917  39 -Z-
1997-01-06 21.93 -62.3583 44.6800  33 --P
1997-01-06 21.93 -62.3583 44.6800  33 -Z-
1997-01-07 02.38 -61.0617 45.0617  27 -Z-
1997-01-07 06.82 -59.7317 45.4017  21 --P
1997-01-07 06.82 -59.7317 45.4017  21 -Z-
1997-01-07 11.23 -58.3917 45.7433  15 -Z-
1997-01-07 15.67 -57.0450 46.0833  9 --P
1997-01-07 15.67 -57.0450 46.0833  9 -Z-
1997-01-07 20.08 -55.6900 46.4233  3 -Z-
1997-02-02 12.05 -64.7667 43.6533  45 --P
1997-02-02 12.05 -64.7667 43.6533  45 -Z-
1997-02-02 16.37 -63.4950 44.0450  39 --P
1997-02-02 16.37 -63.4950 44.0450  39 -Z-
1997-02-02 20.70 -62.2133 44.4350  33 -Z-
1997-02-03 01.03 -60.9250 44.8250  27 --P
1997-02-03 01.03 -60.9250 44.8250  27 -Z-
1997-02-03 05.35 -59.6267 45.2167  21 -Z-
1997-02-03 09.68 -58.3200 45.6067  15 -Z-
1997-02-03 14.02 -57.0033 45.9967  9 --P
1997-02-03 14.02 -57.0033 45.9967  9 -Z-
1997-02-03 18.35 -55.6783 46.3883  3 --P
1997-02-03 18.35 -55.6783 46.3883  3 -Z-
1997-03-31 10.13 -62.9950 43.0683  45 --P
1997-03-31 10.13 -62.9950 43.0683  45 -Z-
1997-03-31 16.92 -61.8283 43.5917  39 --P
1997-03-31 16.92 -61.8283 43.5917  39 -ZP
1997-03-31 23.72 -60.6500 44.1167  33 --P
1997-03-31 23.72 -60.6500 44.1167  33 -Z-
1997-04-01 06.50 -59.4633 44.6400  27 --P
1997-04-01 06.50 -59.4633 44.6400  27 -ZP
1997-04-01 13.28 -58.2633 45.1633  21 --P
1997-04-01 13.28 -58.2633 45.1633  21 -Z-
1997-04-01 20.07 -57.0550 45.6867  15 --P
1997-04-01 20.07 -57.0550 45.6867  15 -Z-
1997-04-02 02.85 -55.8333 46.2117  9 --P
1997-04-02 02.85 -55.8333 46.2117  9 -Z-
1997-04-02 09.40 -54.6250 46.7583  3 --P
1997-04-02 09.40 -54.6250 46.7583  3 -ZP
1997-04-28 03.65 -62.7867 43.2267  45 --P
1997-04-28 03.65 -62.7867 43.2267  45 -ZP
1997-04-28 08.03 -61.6400 43.7783  39 --P
1997-04-28 08.03 -61.6400 43.7783  39 -ZP
1997-04-28 12.43 -60.4833 44.3283  33 --P
1997-04-28 16.83 -59.3150 44.8800  27 --P
1997-04-28 16.83 -59.3150 44.8800  27 -ZP
1997-04-28 21.23 -58.1350 45.4300  21 --P
1997-04-28 21.23 -58.1350 45.4300  21 -Z-
1997-04-29 01.63 -56.9433 45.9800  15 --P
1997-04-29 01.63 -56.9433 45.9800  15 -Z-
1997-04-29 06.03 -55.7400 46.5317  9 --P
1997-04-29 06.03 -55.7400 46.5317  9 -Z-
1997-04-29 10.43 -54.5250 47.0817  3 --P
1997-04-29 10.43 -54.5250 47.0817  3 -Z-
1997-06-23 07.22 -61.8217 43.5767  39 --P
1997-06-23 11.80 -60.6517 44.1083  33 --P
1997-06-23 11.80 -60.6517 44.1083  33 -ZP
1997-06-23 16.40 -59.4700 44.6400  27 -ZP
1997-06-23 21.00 -58.2783 45.1717  21 -Z-
1997-06-24 01.60 -57.0750 45.7033  15 -ZP
1997-06-24 06.18 -55.8600 46.2350  9 -Z-
1997-06-24 10.78 -54.6350 46.7667  3 -Z-
1997-07-20 17.85 -61.0800 43.9683  33 -Z-
1997-07-20 22.17 -59.9017 44.5000  27 --P
1997-07-20 22.17 -59.9017 44.5000  27 -Z-
1997-07-21 02.47 -58.7117 45.0317  21 --P
1997-07-21 02.47 -58.7117 45.0317  21 -ZP
1997-07-21 06.78 -57.5117 45.5617  15 -Z-
1997-07-21 11.10 -56.3000 46.0933  9 -Z-
1997-07-21 15.40 -55.0767 46.6250  3 --P
1997-07-21 15.40 -55.0767 46.6250  3 -Z-
1997-08-16 23.08 -62.0933 42.5733  39 -ZP
1997-08-17 03.22 -60.8983 43.0483  33 --P
1997-08-17 03.22 -60.8983 43.0483  33 -ZP
1997-08-17 07.37 -59.6933 43.5233  27 -Z-
1997-08-17 11.53 -58.5550 44.0733  21 --P
1997-08-17 11.53 -58.5550 44.0733  21 -Z-
1997-08-17 19.97 -56.5283 45.4567  9 -ZP
1997-08-18 00.20 -55.4950 46.1483  3 --P
1997-08-18 00.20 -55.4950 46.1483  3 -Z-
1997-09-14 23.47 -63.0950 43.0033  45 --P
1997-09-14 23.47 -63.0950 43.0033  45 -ZP
1997-09-15 03.90 -61.9317 43.5300  39 --P
1997-09-15 03.90 -61.9317 43.5300  39 -ZP
1997-09-15 08.32 -60.7583 44.0567  33 --P
1997-09-15 08.32 -60.7583 44.0567  33 -ZP
1997-09-15 12.73 -59.5750 44.5833  27 -Z-
1997-09-15 17.15 -58.3800 45.1100  21 --P
1997-09-15 17.15 -58.3800 45.1100  21 -Z-
1997-09-15 21.58 -57.1733 45.6367  15 -ZP
1997-09-16 02.00 -55.9567 46.1650  9 --P
1997-09-16 02.00 -55.9567 46.1650  9 -ZP
1997-09-16 06.42 -54.7267 46.6917  3 --P
1997-09-16 06.42 -54.7267 46.6917  3 -Z-
1997-10-13 16.77 -62.5550 43.2350  39 -Z-
1997-10-13 23.05 -61.3867 43.7617  33 --P
1997-10-13 23.05 -61.3867 43.7617  33 -ZP
1997-10-14 05.33 -60.2083 44.2867  27 --P
1997-10-14 05.33 -60.2083 44.2867  27 -ZP
1997-10-14 11.62 -59.0183 44.8133  21 --P
1997-10-14 11.62 -59.0183 44.8133  21 -ZP
1997-10-14 17.88 -57.8183 45.3400  15 -ZP
1997-10-15 00.17 -56.6067 45.8650  9 --P
1997-10-15 00.17 -56.6067 45.8650  9 -ZP
1997-10-15 06.45 -55.3833 46.3917  3 --P
1997-10-15 06.45 -55.3833 46.3917  3 -Z-
1997-11-10 14.53 -61.8067 43.5750  39 --P
1997-11-10 14.53 -61.8067 43.5750  39 -ZP
1997-11-10 19.02 -60.6333 44.1033  33 --P
1997-11-10 19.02 -60.6333 44.1033  33 -ZP
1997-11-10 23.52 -59.4500 44.6317  27 --P
1997-11-10 23.52 -59.4500 44.6317  27 -ZP
1997-11-11 04.00 -58.2550 45.1600  21 --P
1997-11-11 04.00 -58.2550 45.1600  21 -Z-
1997-11-11 08.50 -57.0500 45.6883  15 --P
1997-11-11 08.50 -57.0500 45.6883  15 -Z-
1997-11-11 13.00 -55.8317 46.2167  9 --P
1997-11-11 13.00 -55.8317 46.2167  9 -ZP
1997-11-11 17.50 -54.6233 46.7583  3 --P
1997-11-11 17.50 -54.6233 46.7583  3 -Z-
1997-12-08 01.07 -62.1300 43.4733  39 --P
1997-12-08 01.07 -62.1300 43.4733  39 -ZP
1997-12-08 05.50 -60.9533 43.9967  33 --P
1997-12-08 05.50 -60.9533 43.9967  33 -Z-
1997-12-08 09.93 -59.7667 44.5200  27 --P
1997-12-08 09.93 -59.7667 44.5200  27 -ZP
1997-12-08 14.37 -58.5700 45.0417  21 --P
1997-12-08 14.37 -58.5700 45.0417  21 -Z-
1997-12-08 18.80 -57.3617 45.5650  15 --P
1997-12-08 18.80 -57.3617 45.5650  15 -Z-
1997-12-08 23.23 -56.1433 46.0867  9 --P
1997-12-08 23.23 -56.1433 46.0867  9 -ZP
1997-12-09 03.67 -54.9117 46.6100  3 --P
1997-12-09 03.67 -54.9117 46.6100  3 -ZP
1998-01-05 01.30 -62.9067 43.1367  45 -Z-
1998-01-05 05.90 -61.7367 43.6583  39 --P
1998-01-05 05.90 -61.7367 43.6583  39 -Z-
1998-01-05 10.50 -60.5567 44.1800  33 -Z-
1998-01-05 15.12 -59.3667 44.7017  27 --P
1998-01-05 15.12 -59.3667 44.7017  27 -ZP
1998-01-05 19.72 -58.1650 45.2233  21 --P
1998-01-05 19.72 -58.1650 45.2233  21 -Z-
1998-01-06 00.32 -56.9517 45.7450  15 --P
1998-01-06 00.32 -56.9517 45.7450  15 -Z-
1998-01-06 04.92 -55.7267 46.2667  9 --P
1998-01-06 04.92 -55.7267 46.2667  9 -ZP
1998-01-06 09.00 -54.5883 46.8667  3 --P
1998-01-06 09.00 -54.5883 46.8667  3 -Z-
1998-02-02 16.17 -62.9800 43.0617  45 --P
1998-02-02 16.17 -62.9800 43.0617  45 -Z-
1998-02-02 21.10 -61.8150 43.5883  39 --P
1998-02-02 21.10 -61.8150 43.5883  39 -ZP
1998-02-03 02.02 -60.6400 44.1150  33 --P
1998-02-03 02.02 -60.6400 44.1150  33 -Z-
1998-02-03 06.95 -59.4550 44.6400  27 --P
1998-02-03 06.95 -59.4550 44.6400  27 -Z-
1998-02-03 11.87 -58.2583 45.1667  21 --P
1998-02-03 11.87 -58.2583 45.1667  21 -ZP
1998-02-03 16.80 -57.0500 45.6933  15 --P
1998-02-03 16.80 -57.0500 45.6933  15 -ZP
1998-02-03 21.73 -55.8300 46.2183  9 --P
1998-02-03 21.73 -55.8300 46.2183  9 -Z-
1998-02-04 02.63 -54.6217 46.7600  3 --P
1998-02-04 02.63 -54.6217 46.7600  3 -Z-
1998-03-03 06.30 -62.7167 43.1933  3 --P
1998-03-03 06.30 -62.7167 43.1933  3 -ZP
1998-03-30 13.72 -61.9483 43.5583  39 --P
1998-03-30 13.72 -61.9483 43.5583  39 -ZP
1998-03-30 18.43 -60.7700 44.0783  33 --P
1998-03-30 18.43 -60.7700 44.0783  33 -Z-
1998-03-30 23.15 -59.5817 44.6000  27 --P
1998-03-30 23.15 -59.5817 44.6000  27 -Z-
1998-03-31 03.87 -58.3817 45.1217  21 --P
1998-03-31 03.87 -58.3817 45.1217  21 -ZP
1998-03-31 08.58 -57.1700 45.6433  15 --P
1998-03-31 08.58 -57.1700 45.6433  15 -Z-
1998-03-31 13.30 -55.9483 46.1650  9 --P
1998-03-31 13.30 -55.9483 46.1650  9 -Z-
1998-03-31 17.97 -54.7350 46.7033  3 --P
1998-03-31 17.97 -54.7350 46.7033  3 -Z-
1998-04-27 01.42 -63.0600 43.0217  45 --P
1998-04-27 01.42 -63.0600 43.0217  45 -ZP
1998-04-27 06.17 -61.8950 43.5483  39 --P
1998-04-27 06.17 -61.8950 43.5483  39 -ZP
1998-04-27 10.92 -60.7217 44.0750  33 --P
1998-04-27 10.92 -60.7217 44.0750  33 -ZP
1998-04-27 15.67 -59.5367 44.6017  27 --P
1998-04-27 15.67 -59.5367 44.6017  27 -Z-
1998-04-27 20.43 -58.3417 45.1283  21 --P
1998-04-27 20.43 -58.3417 45.1283  21 -ZP
1998-04-28 01.18 -57.1350 45.6550  15 --P
1998-04-28 01.18 -57.1350 45.6550  15 -ZP
1998-04-28 05.93 -55.9167 46.1817  9 --P
1998-04-28 05.93 -55.9167 46.1817  9 -ZP
1998-04-28 10.70 -54.6867 46.7083  3 --P
1998-04-28 10.70 -54.6867 46.7083  3 -ZP
1998-05-25 04.45 -61.7633 43.6400  39 --P
1998-05-25 04.45 -61.7633 43.6400  39 -ZP
1998-05-25 09.17 -60.5833 44.1633  33 --P
1998-05-25 09.17 -60.5833 44.1633  33 -Z-
1998-05-25 13.90 -59.3950 44.6850  27 -Z-
1998-05-25 18.62 -58.1933 45.2083  21 --P
1998-05-25 18.62 -58.1933 45.2083  21 -Z-
1998-05-25 23.35 -56.9817 45.7317  15 --P
1998-05-25 23.35 -56.9817 45.7317  15 -ZP
1998-05-26 04.07 -55.7600 46.2533  9 --P
1998-05-26 04.07 -55.7600 46.2533  9 -Z-
1998-05-26 08.75 -54.5700 46.8100  3 --P
1998-05-26 08.75 -54.5700 46.8100  3 -ZP
1998-06-21 23.77 -63.2100 42.9300  45 --P
1998-06-21 23.77 -63.2100 42.9300  45 -Z-
1998-06-22 04.12 -62.0500 43.4567  39 --P
1998-06-22 04.12 -62.0500 43.4567  39 -ZP
1998-06-22 08.48 -60.8783 43.9850  33 --P
1998-06-22 08.48 -60.8783 43.9850  33 -Z-
1998-06-22 12.83 -59.6967 44.5133  27 --P
1998-06-22 12.83 -59.6967 44.5133  27 -Z-
1998-06-22 17.20 -58.5050 45.0417  21 --P
1998-06-22 17.20 -58.5050 45.0417  21 -ZP
1998-06-22 21.57 -57.3000 45.5683  15 --P
1998-06-22 21.57 -57.3000 45.5683  15 -ZP
1998-06-23 01.92 -56.0850 46.0967  9 -Z-
1998-06-23 06.28 -54.8583 46.6250  3 -Z-
1998-07-20 14.63 -58.1033 45.2033  21 -Z-
1998-07-20 18.50 -56.9017 45.7367  15 --P
1998-07-20 18.50 -56.9017 45.7367  15 -Z-
1998-07-20 22.38 -55.6883 46.2717  9 -Z-
1998-07-21 02.32 -54.5317 46.8533  3 -Z-
1998-08-17 01.63 -61.9467 43.4983  39 --P
1998-08-17 01.63 -61.9467 43.4983  39 -ZP
1998-08-17 05.82 -60.8367 44.0900  33 --P
1998-08-17 05.82 -60.8367 44.0900  33 -ZP
1998-08-17 10.05 -59.6417 44.6067  27 -Z-
1998-08-17 14.28 -58.4367 45.1217  21 -Z-
1998-08-17 18.52 -57.2217 45.6367  15 --P
1998-08-17 18.52 -57.2217 45.6367  15 -ZP
1998-08-17 22.77 -55.9950 46.1533  9 --P
1998-08-17 22.77 -55.9950 46.1533  9 -ZP
1998-08-18 03.00 -54.7683 46.6783  3 --P
1998-08-18 03.00 -54.7683 46.6783  3 -ZP
1998-09-13 21.73 -62.4017 43.2250  39 --P
1998-09-13 21.73 -62.4017 43.2250  39 -Z-
1998-09-14 02.23 -61.2417 43.7600  33 --P
1998-09-14 02.23 -61.2417 43.7600  33 -Z-
1998-09-14 06.75 -60.0717 44.2950  27 -Z-
1998-09-14 11.25 -58.8900 44.8317  21 --P
1998-09-14 11.25 -58.8900 44.8317  21 -Z-
1998-09-14 15.77 -57.6983 45.3667  15 --P
1998-09-14 15.77 -57.6983 45.3667  15 -ZP
1998-09-14 20.27 -56.4950 45.9017  9 --P
1998-09-14 20.27 -56.4950 45.9017  9 -ZP
1998-09-15 00.78 -55.2783 46.4383  3 --P
1998-09-15 00.78 -55.2783 46.4383  3 -Z-
1998-11-09 00.48 -63.4467 42.7517  45 -Z-
1998-11-09 04.85 -62.3167 43.3100  39 --P
1998-11-09 04.85 -62.3167 43.3100  39 -ZP
1998-11-09 09.20 -61.1767 43.8700  33 --P
1998-11-09 09.20 -61.1767 43.8700  33 -ZP
1998-11-09 13.43 -60.0100 44.4133  27 --P
1998-11-09 13.43 -60.0100 44.4133  27 -ZP
1998-11-09 17.57 -58.8200 44.9417  21 --P
1998-11-09 17.57 -58.8200 44.9417  21 -ZP
1998-11-09 21.70 -57.6183 45.4683  15 --P
1998-11-09 21.70 -57.6183 45.4683  15 -Z-
1998-11-10 01.83 -56.4067 45.9967  9 --P
1998-11-10 01.83 -56.4067 45.9967  9 -ZP
1998-11-10 05.97 -55.1817 46.5250  3 --P
1998-11-10 05.97 -55.1817 46.5250  3 -Z-
1999-01-02 23.68 -62.7167 43.0050  45 --P
1999-01-02 23.68 -62.7167 43.0050  45 -ZP
1999-01-03 04.72 -61.6483 43.6300  39 --P
1999-01-03 04.72 -61.6483 43.6300  39 -ZP
1999-01-03 09.70 -60.5633 44.2500  33 --P
1999-01-03 09.70 -60.5633 44.2500  33 -ZP
1999-01-03 14.07 -59.4067 44.8117  27 --P
1999-01-03 14.07 -59.4067 44.8117  27 -Z-
1999-01-03 18.43 -58.2383 45.3733  21 --P
1999-01-03 18.43 -58.2383 45.3733  21 -Z-
1999-01-03 22.80 -57.0583 45.9350  15 --P
1999-01-03 22.80 -57.0583 45.9350  15 -ZP
1999-01-04 03.17 -55.8667 46.4950  9 -ZP
1999-01-04 07.53 -54.6617 47.0567  3 --P
1999-01-04 07.53 -54.6617 47.0567  3 -Z-
1999-02-02 12.63 -64.7167 43.6933  45 --P
1999-02-02 12.63 -64.7167 43.6933  45 -ZP
1999-02-02 17.33 -63.4417 44.0800  39 --P
1999-02-02 17.33 -63.4417 44.0800  39 -ZP
1999-02-02 22.03 -62.1583 44.4683  33 --P
1999-02-02 22.03 -62.1583 44.4683  33 -ZP
1999-02-03 02.75 -60.8667 44.8550  27 -Z-
1999-02-03 07.45 -59.5667 45.2433  21 --P
1999-02-03 07.45 -59.5667 45.2433  21 -Z-
1999-02-03 12.17 -58.2567 45.6300  15 --P
1999-02-03 12.17 -58.2567 45.6300  15 -Z-
1999-02-03 16.87 -56.9383 46.0183  9 --P
1999-02-03 16.87 -56.9383 46.0183  9 -Z-
1999-02-03 21.58 -55.6117 46.4067  3 --P
1999-02-03 21.58 -55.6117 46.4067  3 -ZP
1999-03-01 13.93 -64.1783 43.8000  45 --P
1999-03-01 13.93 -64.1783 43.8000  45 -Z-
1999-03-01 19.65 -62.8700 44.1283  39 --P
1999-03-01 19.65 -62.8700 44.1283  39 -Z-
1999-03-02 01.38 -61.5550 44.4567  33 --P
1999-03-02 01.38 -61.5550 44.4567  33 -Z-
1999-03-02 07.12 -60.2333 44.7850  27 --P
1999-03-02 07.12 -60.2333 44.7850  27 -Z-
1999-03-02 12.85 -58.9033 45.1150  21 --P
1999-03-02 12.85 -58.9033 45.1150  21 -Z-
1999-03-02 18.57 -57.5667 45.4433  15 --P
1999-03-02 18.57 -57.5667 45.4433  15 -ZP
1999-03-03 00.30 -56.2200 45.7717  9 --P
1999-03-03 00.30 -56.2200 45.7717  9 -Z-
1999-03-03 06.03 -54.8667 46.1000  3 --P
1999-03-03 06.03 -54.8667 46.1000  3 -Z-
1999-03-30 03.40 -64.3233 43.8150  45 --P
1999-03-30 03.40 -64.3233 43.8150  45 -ZP
1999-03-30 08.08 -63.0517 44.2117  39 --P
1999-03-30 08.08 -63.0517 44.2117  39 -Z-
1999-03-30 12.75 -61.7700 44.6067  33 --P
1999-03-30 12.75 -61.7700 44.6067  33 -Z-
1999-03-30 17.43 -60.4800 45.0033  27 --P
1999-03-30 17.43 -60.4800 45.0033  27 -Z-
1999-03-30 22.10 -59.1817 45.3983  21 --P
1999-03-30 22.10 -59.1817 45.3983  21 -ZP
1999-03-31 02.78 -57.8733 45.7933  15 --P
1999-03-31 02.78 -57.8733 45.7933  15 -Z-
1999-03-31 07.45 -56.5550 46.1900  9 --P
1999-03-31 07.45 -56.5550 46.1900  9 -Z-
1999-03-31 12.13 -55.2283 46.5850  3 --P
1999-03-31 12.13 -55.2283 46.5850  3 -ZP
1999-04-26 10.22 -61.4233 43.5500  39 --P
1999-04-26 10.22 -61.4233 43.5500  39 -ZP
1999-04-26 14.65 -60.3033 44.1350  33 --P
1999-04-26 14.65 -60.3033 44.1350  33 -ZP
1999-04-26 19.08 -59.1733 44.7217  27 --P
1999-04-26 19.08 -59.1733 44.7217  27 -ZP
1999-04-26 23.53 -58.0300 45.3067  21 --P
1999-04-26 23.53 -58.0300 45.3067  21 -ZP
1999-04-27 03.97 -56.8750 45.8933  15 --P
1999-04-27 03.97 -56.8750 45.8933  15 -ZP
1999-04-27 08.42 -55.7083 46.4783  9 --P
1999-04-27 08.42 -55.7083 46.4783  9 -Z-
1999-04-27 12.87 -54.5300 47.0650  3 --P
1999-04-27 12.87 -54.5300 47.0650  3 -ZP
1999-05-24 17.12 -63.6283 43.9650  39 --P
1999-05-24 17.12 -63.6283 43.9650  39 -Z-
1999-05-24 21.07 -62.3533 44.3617  33 -ZP
1999-05-25 01.02 -61.0700 44.7600  27 -Z-
1999-05-25 04.97 -59.7783 45.1567  21 --P
1999-05-25 04.97 -59.7783 45.1567  21 -ZP
1999-05-25 08.92 -58.4767 45.5550  15 --P
1999-05-25 08.92 -58.4767 45.5550  15 -Z-
1999-05-25 12.87 -57.1650 45.9517  9 --P
1999-05-25 12.87 -57.1650 45.9517  9 -Z-
1999-05-25 16.83 -55.8450 46.3500  3 --P
1999-05-25 16.83 -55.8450 46.3500  3 -ZP
1999-07-19 13.78 -64.8800 43.6600  45 --P
1999-07-19 13.78 -64.8800 43.6600  45 -Z-
1999-07-19 17.67 -63.6367 44.0983  39 --P
1999-07-19 17.67 -63.6367 44.0983  39 -ZP
1999-07-19 21.55 -62.3850 44.5383  33 --P
1999-07-19 21.55 -62.3850 44.5383  33 -Z-
1999-07-20 01.43 -61.1250 44.9767  27 --P
1999-07-20 01.43 -61.1250 44.9767  27 -ZP
1999-07-20 05.28 -59.8400 45.3950  21 --P
1999-07-20 05.28 -59.8400 45.3950  21 -Z-
1999-07-20 09.12 -58.5417 45.8050  15 -Z-
1999-07-20 12.95 -57.2333 46.2167  9 --P
1999-07-20 12.95 -57.2333 46.2167  9 -Z-
1999-07-20 16.78 -55.9150 46.6267  3 --P
1999-07-20 16.78 -55.9150 46.6267  3 -ZP
1999-08-16 15.28 -63.6717 44.0667  45 --P
1999-08-16 15.28 -63.6717 44.0667  45 -ZP
1999-08-16 19.00 -62.4150 44.4950  39 -ZP
1999-08-16 22.72 -61.1483 44.9250  33 --P
1999-08-16 22.72 -61.1483 44.9250  33 -ZP
1999-08-17 02.42 -59.8717 45.3533  27 -ZP
1999-08-17 06.10 -58.5667 45.7517  21 -Z-
1999-08-17 13.38 -55.8783 46.4617  9 -Z-
1999-08-17 17.05 -54.5467 46.8383  3 -Z-
1999-09-13 14.07 -64.9400 43.6217  45 --P
1999-09-13 14.07 -64.9400 43.6217  45 -ZP
1999-09-13 18.47 -63.6900 44.0450  39 --P
1999-09-13 18.47 -63.6900 44.0450  39 -ZP
1999-09-13 22.88 -62.4300 44.4683  33 --P
1999-09-13 22.88 -62.4300 44.4683  33 -ZP
1999-09-14 03.32 -61.1600 44.8933  27 --P
1999-09-14 03.32 -61.1600 44.8933  27 -ZP
1999-09-14 07.73 -59.8817 45.3167  21 --P
1999-09-14 07.73 -59.8817 45.3167  21 -ZP
1999-09-14 12.15 -58.5933 45.7417  15 --P
1999-09-14 12.15 -58.5933 45.7417  15 -Z-
1999-09-14 16.57 -57.2950 46.1650  9 --P
1999-09-14 16.57 -57.2950 46.1650  9 -ZP
1999-09-14 20.98 -55.9867 46.5900  3 -ZP
1999-10-11 16.40 -63.8933 43.9967  39 --P
1999-10-11 20.27 -62.6350 44.4200  33 --P
1999-10-11 20.27 -62.6350 44.4200  33 -ZP
1999-10-12 00.15 -61.3650 44.8433  27 --P
1999-10-12 00.15 -61.3650 44.8433  27 -ZP
1999-10-12 04.02 -60.0883 45.2667  21 --P
1999-10-12 04.02 -60.0883 45.2667  21 -ZP
1999-10-12 07.90 -58.8000 45.6900  15 -Z-
1999-10-12 11.78 -57.5017 46.1133  9 --P
1999-10-12 11.78 -57.5017 46.1133  9 -ZP
1999-10-12 15.67 -56.1950 46.5367  3 -ZP
1999-11-08 20.48 -64.0367 43.9350  45 -ZP
1999-11-09 00.58 -62.7800 44.3633  39 --P
1999-11-09 00.58 -62.7800 44.3633  39 -Z-
1999-11-09 04.70 -61.5150 44.7900  33 -Z-
1999-11-09 08.80 -60.2400 45.2167  27 --P
1999-11-09 08.80 -60.2400 45.2167  27 -Z-
1999-11-09 12.90 -58.9567 45.6433  21 --P
1999-11-09 12.90 -58.9567 45.6433  21 -Z-
1999-11-09 17.00 -57.6633 46.0717  15 --P
1999-11-09 17.00 -57.6633 46.0717  15 -Z-
1999-11-09 21.10 -56.3583 46.4983  9 --P
1999-11-09 21.10 -56.3583 46.4983  9 -ZP
1999-11-10 01.70 -54.9317 46.6467  3 --P
1999-11-10 01.70 -54.9317 46.6467  3 -ZP
1999-12-06 21.83 -64.1667 43.8550  45 --P
1999-12-06 21.83 -64.1667 43.8550  45 -ZP
1999-12-07 01.82 -62.8900 44.2467  39 --P
1999-12-07 01.82 -62.8900 44.2467  39 -ZP
1999-12-07 05.80 -61.6067 44.6383  33 --P
1999-12-07 05.80 -61.6067 44.6383  33 -Z-
1999-12-07 09.78 -60.3133 45.0300  27 --P
1999-12-07 09.78 -60.3133 45.0300  27 -ZP
1999-12-07 13.77 -59.0117 45.4217  21 --P
1999-12-07 13.77 -59.0117 45.4217  21 -Z-
1999-12-07 17.75 -57.7000 45.8133  15 --P
1999-12-07 17.75 -57.7000 45.8133  15 -Z-
1999-12-07 21.73 -56.3800 46.2050  9 --P
1999-12-07 21.73 -56.3800 46.2050  9 -ZP
1999-12-08 01.72 -55.0500 46.5967  3 --P
1999-12-08 01.72 -55.0500 46.5967  3 -ZP
Sub-Collection:   North Atlantic CPR sample data. COPEPOD
https://www.st.nmfs.noaa.gov/copepod
Web v10.1   [ 2010-Dec ]