zzzz-950113  
Ship/Platform:   Ships of Opportunity
Original Cruise ID:   [ Area IB ]

[ back to previous window ]  


* The stations below are sorted by date, then by time, and then by "Orig-Identifier".   As time over-rides the Orig-Identifier sequencing,
missing or incorrect times may create incorrect "Orig-Identifier" and/or station sorting.


* * B= Total Biomass, Z = Zooplankton, P = Phytoplankton
YYYY-MM-DD* Time (GMT)* Longitude Latitude Station
(Orig-Identifier*)
Station
(Parameter List**)
1995-01-13 12.07 -8.1100 46.2117  27 -Z-
1995-01-13 16.25 -7.5700 47.1400  21 -Z-
1995-01-13 18.33 -7.2967 47.6033  18 -Z-
1995-01-13 20.43 -7.0200 48.0683  15 --P
1995-01-13 20.43 -7.0200 48.0683  15 -Z-
1995-01-13 22.52 -6.7417 48.5317  12 -Z-
1995-01-14 00.62 -6.4617 48.9967  9 --P
1995-01-14 00.62 -6.4617 48.9967  9 -Z-
1995-01-14 04.75 -5.8650 49.9133  3 -Z-
1995-02-11 18.30 -8.1117 47.4217  33 -Z-
1995-02-11 20.55 -7.9033 47.9017  30 -Z-
1995-02-11 22.82 -7.6933 48.3817  27 -Z-
1995-02-12 01.08 -7.4833 48.8617  24 -ZP
1995-02-12 03.33 -7.2683 49.3417  21 -Z-
1995-02-12 07.87 -6.8350 50.3017  15 -Z-
1995-02-12 12.38 -6.3933 51.2617  9 -Z-
1995-02-12 16.85 -5.9700 52.2250  3 -Z-
1995-03-11 15.43 -8.0267 47.0850  39 --P
1995-03-11 15.43 -8.0267 47.0850  39 -ZP
1995-03-11 17.78 -7.8067 47.5617  36 --P
1995-03-11 17.78 -7.8067 47.5617  36 -ZP
1995-03-11 20.13 -7.5850 48.0400  33 --P
1995-03-11 20.13 -7.5850 48.0400  33 -Z-
1995-03-11 22.47 -7.3633 48.5167  30 --P
1995-03-11 22.47 -7.3633 48.5167  30 -Z-
1995-03-12 00.82 -7.1367 48.9950  27 --P
1995-03-12 00.82 -7.1367 48.9950  27 -Z-
1995-03-12 05.52 -6.6800 49.9483  21 -Z-
1995-03-12 10.22 -6.2133 50.9033  15 -Z-
1995-03-12 14.88 -5.7350 51.8583  9 -Z-
1995-03-12 18.83 -5.1683 52.7950  3 -Z-
1995-04-07 15.00 -8.0350 47.0183  39 --P
1995-04-07 15.00 -8.0350 47.0183  39 -Z-
1995-04-07 17.17 -7.8183 47.4967  36 --P
1995-04-07 17.17 -7.8183 47.4967  36 -Z-
1995-04-07 19.35 -7.5983 47.9733  33 --P
1995-04-07 19.35 -7.5983 47.9733  33 -Z-
1995-04-07 21.52 -7.3783 48.4517  30 --P
1995-04-07 21.52 -7.3783 48.4517  30 -Z-
1995-04-07 23.70 -7.1550 48.9300  27 --P
1995-04-07 23.70 -7.1550 48.9300  27 -Z-
1995-04-08 04.05 -6.7017 49.8850  21 -Z-
1995-04-08 08.40 -6.2400 50.8400  15 -Z-
1995-04-08 12.77 -5.7683 51.7950  9 --P
1995-04-08 12.77 -5.7683 51.7950  9 -Z-
1995-04-08 16.80 -5.2017 52.7333  3 -Z-
1995-05-06 09.77 -8.3550 46.6417  39 --P
1995-05-06 09.77 -8.3550 46.6417  39 -Z-
1995-05-06 14.07 -7.9600 47.6050  33 --P
1995-05-06 14.07 -7.9600 47.6050  33 -Z-
1995-05-06 16.22 -7.7600 48.0867  30 --P
1995-05-06 16.22 -7.7600 48.0867  30 -ZP
1995-05-06 18.37 -7.5583 48.5683  27 --P
1995-05-06 18.37 -7.5583 48.5683  27 -ZP
1995-05-06 20.52 -7.3550 49.0500  24 --P
1995-05-06 20.52 -7.3550 49.0500  24 -Z-
1995-05-06 22.65 -7.1483 49.5317  21 --P
1995-05-06 22.65 -7.1483 49.5317  21 -Z-
1995-05-07 02.95 -6.7317 50.4950  15 -Z-
1995-05-07 07.25 -6.3050 51.4567  9 --P
1995-05-07 07.25 -6.3050 51.4567  9 -Z-
1995-05-07 11.38 -5.9483 52.4300  3 -Z-
1995-06-05 02.00 -8.2517 46.8850  39 --P
1995-06-05 02.00 -8.2517 46.8850  39 -ZP
1995-06-05 04.27 -8.0550 47.3650  36 --P
1995-06-05 04.27 -8.0550 47.3650  36 -ZP
1995-06-05 06.53 -7.8550 47.8467  33 --P
1995-06-05 06.53 -7.8550 47.8467  33 -ZP
1995-06-05 08.78 -7.6533 48.3283  30 --P
1995-06-05 08.78 -7.6533 48.3283  30 -Z-
1995-06-05 11.05 -7.4517 48.8100  27 -Z-
1995-06-05 15.58 -7.0383 49.7733  21 -Z-
1995-06-05 20.12 -6.6183 50.7367  15 --P
1995-06-05 20.12 -6.6183 50.7367  15 -ZP
1995-06-06 00.63 -6.1883 51.7000  9 -Z-
1995-06-06 05.35 -5.9267 52.6817  3 -Z-
1995-07-01 12.50 -8.4083 46.5100  39 --P
1995-07-01 12.50 -8.4083 46.5100  39 -ZP
1995-07-01 16.95 -8.0150 47.4733  33 --P
1995-07-01 16.95 -8.0150 47.4733  33 -ZP
1995-07-01 19.17 -7.8150 47.9550  30 --P
1995-07-01 19.17 -7.8150 47.9550  30 -ZP
1995-07-01 21.38 -7.6133 48.4367  27 --P
1995-07-01 21.38 -7.6133 48.4367  27 -ZP
1995-07-01 23.60 -7.4100 48.9183  24 -Z-
1995-07-02 01.83 -7.2050 49.4000  21 --P
1995-07-02 01.83 -7.2050 49.4000  21 -Z-
1995-07-02 06.27 -6.7883 50.3633  15 --P
1995-07-02 06.27 -6.7883 50.3633  15 -Z-
1995-07-02 10.70 -6.3633 51.3250  9 --P
1995-07-02 10.70 -6.3633 51.3250  9 -Z-
1995-07-02 15.27 -5.9733 52.2933  3 --P
1995-07-02 15.27 -5.9733 52.2933  3 -Z-
1995-07-27 11.72 -8.3200 46.6533  39 --P
1995-07-27 11.72 -8.3200 46.6533  39 -Z-
1995-07-27 16.25 -7.9300 47.6167  33 -Z-
1995-07-27 18.50 -7.7333 48.1000  30 -Z-
1995-07-27 20.77 -7.5333 48.5817  27 --P
1995-07-27 20.77 -7.5333 48.5817  27 -Z-
1995-07-27 23.02 -7.3317 49.0633  24 --P
1995-07-27 23.02 -7.3317 49.0633  24 -Z-
1995-07-28 01.28 -7.1283 49.5450  21 --P
1995-07-28 01.28 -7.1283 49.5450  21 -ZP
1995-07-28 05.80 -6.7150 50.5100  15 --P
1995-07-28 05.80 -6.7150 50.5100  15 -ZP
1995-07-28 10.32 -6.2933 51.4733  9 --P
1995-07-28 10.32 -6.2933 51.4733  9 -ZP
1995-08-23 05.27 -8.2650 46.6050  45 --P
1995-08-23 05.27 -8.2650 46.6050  45 -ZP
1995-08-23 09.98 -7.8283 47.5600  39 --P
1995-08-23 09.98 -7.8283 47.5600  39 -ZP
1995-08-23 12.33 -7.6067 48.0367  36 --P
1995-08-23 12.33 -7.6067 48.0367  36 -ZP
1995-08-23 14.70 -7.3833 48.5133  33 --P
1995-08-23 14.70 -7.3833 48.5133  33 -ZP
1995-08-23 19.42 -6.9300 49.4683  27 --P
1995-08-23 19.42 -6.9300 49.4683  27 -ZP
1995-08-24 00.13 -6.4667 50.4233  21 --P
1995-08-24 00.13 -6.4667 50.4233  21 -ZP
1995-08-24 04.85 -5.9950 51.3767  15 --P
1995-08-24 04.85 -5.9950 51.3767  15 -ZP
1995-08-24 09.50 -5.4267 52.3117  9 --P
1995-08-24 09.50 -5.4267 52.3117  9 -ZP
1995-08-24 14.08 -4.7933 53.2350  3 -Z-
1995-09-23 09.97 -8.3917 46.6067  39 --P
1995-09-23 09.97 -8.3917 46.6067  39 -ZP
1995-09-23 14.50 -8.0017 47.5717  33 --P
1995-09-23 14.50 -8.0017 47.5717  33 -ZP
1995-09-23 16.75 -7.8033 48.0533  30 --P
1995-09-23 16.75 -7.8033 48.0533  30 -ZP
1995-09-23 19.02 -7.6050 48.5350  27 --P
1995-09-23 19.02 -7.6050 48.5350  27 -ZP
1995-09-23 21.27 -7.4033 49.0167  24 --P
1995-09-23 21.27 -7.4033 49.0167  24 -ZP
1995-09-23 23.53 -7.2000 49.4983  21 --P
1995-09-23 23.53 -7.2000 49.4983  21 -ZP
1995-09-24 04.05 -6.7867 50.4633  15 --P
1995-09-24 04.05 -6.7867 50.4633  15 -ZP
1995-09-24 08.58 -6.3650 51.4267  9 -Z-
1995-09-24 13.18 -5.9633 52.3933  3 --P
1995-09-24 13.18 -5.9633 52.3933  3 -ZP
1995-10-20 11.72 -8.0733 46.9883  39 -ZP
1995-10-20 13.73 -7.8567 47.4667  36 -ZP
1995-10-20 15.77 -7.6383 47.9450  33 --P
1995-10-20 15.77 -7.6383 47.9450  33 -ZP
1995-10-20 17.78 -7.4167 48.4217  30 --P
1995-10-20 17.78 -7.4167 48.4217  30 -ZP
1995-10-20 19.82 -7.1933 48.9000  27 --P
1995-10-20 19.82 -7.1933 48.9000  27 -ZP
1995-10-20 23.87 -6.7417 49.8550  21 -Z-
1995-10-21 03.92 -6.2800 50.8100  15 -Z-
1995-10-21 07.98 -5.8083 51.7667  9 -Z-
1995-10-21 13.00 -5.2317 52.7000  3 -ZP
1995-11-18 17.55 -8.1333 47.0383  33 -Z-
1995-11-18 19.82 -7.9083 47.5133  30 -ZP
1995-11-18 22.07 -7.6783 47.9900  27 -Z-
1995-11-19 00.33 -7.4483 48.4650  24 --P
1995-11-19 00.33 -7.4483 48.4650  24 -ZP
1995-11-19 02.58 -7.2150 48.9400  21 -ZP
1995-11-19 07.10 -6.7433 49.8917  15 -Z-
1995-11-19 11.62 -6.2617 50.8433  9 -Z-
1995-11-19 16.13 -5.7700 51.7950  3 -Z-
1995-12-13 04.02 -8.1600 46.7900  39 -Z-
1995-12-13 06.38 -7.9417 47.2667  36 -Z-
1995-12-13 08.75 -7.7200 47.7433  33 -Z-
1995-12-13 13.48 -7.2717 48.6967  27 --P
1995-12-13 13.48 -7.2717 48.6967  27 -Z-
1995-12-13 18.22 -6.8150 49.6517  21 -Z-
1995-12-13 22.95 -6.3483 50.6050  15 -Z-
1995-12-14 03.68 -5.8717 51.5600  9 --P
1995-12-14 03.68 -5.8717 51.5600  9 -Z-
1995-12-14 08.47 -5.3300 52.5017  3 -Z-
1996-05-18 11.60 -8.1317 46.8067  39 -Z-
1996-05-18 14.15 -7.9150 47.2850  36 --P
1996-05-18 14.15 -7.9150 47.2850  36 -ZP
1996-05-18 16.68 -7.6967 47.7617  33 --P
1996-05-18 16.68 -7.6967 47.7617  33 -ZP
1996-05-18 19.23 -7.4767 48.2400  30 --P
1996-05-18 19.23 -7.4767 48.2400  30 -Z-
1996-05-18 21.78 -7.2550 48.7183  27 --P
1996-05-18 21.78 -7.2550 48.7183  27 -ZP
1996-05-19 02.88 -6.8033 49.6733  21 --P
1996-05-19 02.88 -6.8033 49.6733  21 -Z-
1996-05-19 07.98 -6.3433 50.6283  15 --P
1996-05-19 07.98 -6.3433 50.6283  15 -ZP
1996-05-19 13.08 -5.8750 51.5833  9 --P
1996-05-19 13.08 -5.8750 51.5833  9 -ZP
1996-05-19 18.08 -5.3617 52.5317  3 --P
1996-05-19 18.08 -5.3617 52.5317  3 -Z-
1996-06-14 14.02 -8.2550 46.1967  33 --P
1996-06-14 14.02 -8.2550 46.1967  33 -ZP
1996-06-14 18.22 -7.6900 47.1183  27 --P
1996-06-14 18.22 -7.6900 47.1183  27 -ZP
1996-06-14 22.42 -7.1133 48.0400  21 --P
1996-06-14 22.42 -7.1133 48.0400  21 -ZP
1996-06-15 02.63 -6.5267 48.9600  15 --P
1996-06-15 02.63 -6.5267 48.9600  15 -ZP
1996-06-16 17.97 -5.0067 52.9333  3 -Z-
1996-08-08 09.58 -8.1200 46.8533  39 --P
1996-08-08 09.58 -8.1200 46.8533  39 -ZP
1996-08-08 13.77 -7.6767 47.8067  33 --P
1996-08-08 13.77 -7.6767 47.8067  33 -ZP
1996-08-08 17.93 -7.2250 48.7600  27 --P
1996-08-08 17.93 -7.2250 48.7600  27 -Z-
1996-08-08 22.12 -6.7650 49.7133  21 --P
1996-08-08 22.12 -6.7650 49.7133  21 -Z-
1996-08-09 02.18 -6.3167 50.6700  15 --P
1996-08-09 02.18 -6.3167 50.6700  15 -ZP
1996-08-09 06.17 -5.8700 51.6300  9 --P
1996-08-09 06.17 -5.8700 51.6300  9 -Z-
1996-08-09 10.53 -5.3200 52.5700  3 -ZP
1996-09-03 15.83 -8.2467 47.6817  33 --P
1996-09-03 15.83 -8.2467 47.6817  33 -ZP
1996-09-03 20.55 -7.7883 48.6333  27 --P
1996-09-03 20.55 -7.7883 48.6333  27 -Z-
1996-09-04 01.27 -7.3200 49.5850  21 -Z-
1996-09-04 05.98 -6.8417 50.5367  15 --P
1996-09-04 05.98 -6.8417 50.5367  15 -Z-
1996-09-04 10.70 -6.3550 51.4883  9 --P
1996-09-04 10.70 -6.3550 51.4883  9 -Z-
1996-09-04 15.30 -5.9350 52.4500  3 --P
1996-09-04 15.30 -5.9350 52.4500  3 -Z-
1996-10-03 10.30 -6.9767 49.6283  3 -ZP
1996-10-03 15.20 -7.4417 48.6767  9 --P
1996-10-03 15.20 -7.4417 48.6767  9 -ZP
1996-10-03 20.10 -7.9000 47.7250  15 --P
1996-10-03 20.10 -7.9000 47.7250  15 -ZP
1996-10-04 01.00 -8.3500 46.7733  21 --P
1996-10-04 01.00 -8.3500 46.7733  21 -ZP
1996-10-04 05.90 -8.7917 45.8217  27 --P
1996-10-04 05.90 -8.7917 45.8217  27 -ZP
1996-10-04 10.82 -9.2250 44.8683  33 -ZP
1996-10-24 18.98 -8.7583 45.7467  39 --P
1996-10-24 18.98 -8.7583 45.7467  39 -ZP
1996-10-24 22.78 -8.3667 46.7083  33 --P
1996-10-24 22.78 -8.3667 46.7083  33 -ZP
1996-10-25 02.58 -7.9683 47.6717  27 --P
1996-10-25 02.58 -7.9683 47.6717  27 -ZP
1996-10-25 06.37 -7.5633 48.6333  21 --P
1996-10-25 06.37 -7.5633 48.6333  21 -ZP
1996-10-25 10.17 -7.1500 49.5967  15 --P
1996-10-25 10.17 -7.1500 49.5967  15 -Z-
1996-10-25 13.97 -6.7283 50.5583  9 --P
1996-10-25 13.97 -6.7283 50.5583  9 -Z-
1996-10-25 17.77 -6.2983 51.5217  3 -Z-
1996-11-20 11.50 -8.9833 46.4817  39 --P
1996-11-20 11.50 -8.9833 46.4817  39 -ZP
1996-11-20 16.95 -8.0067 47.1967  33 -Z-
1996-11-20 21.85 -7.5383 48.1450  27 --P
1996-11-20 21.85 -7.5383 48.1450  27 -ZP
1996-11-21 02.70 -7.0733 49.0967  21 -Z-
1996-11-21 07.55 -6.6017 50.0483  15 -Z-
1996-11-21 11.85 -6.1600 51.0083  9 -Z-
1996-11-21 16.37 -5.6750 51.9583  3 -Z-
1996-12-17 12.90 -8.2800 46.5100  39 --P
1996-12-17 17.28 -7.8383 47.4633  33 --P
1996-12-17 17.28 -7.8383 47.4633  33 -Z-
1996-12-17 21.65 -7.3900 48.4167  27 -Z-
1996-12-18 02.02 -6.9317 49.3700  21 -Z-
1996-12-18 06.43 -6.4733 50.3250  15 -Z-
1996-12-18 10.93 -6.0267 51.2850  9 -Z-
1996-12-18 15.50 -5.5200 52.2333  3 -Z-
1997-01-14 19.07 -8.1083 46.2033  33 -Z-
1997-01-14 23.13 -7.5750 47.1333  27 --P
1997-01-14 23.13 -7.5750 47.1333  27 -ZP
1997-01-15 03.22 -7.0333 48.0633  21 -Z-
1997-01-15 07.30 -6.4817 48.9933  15 -Z-
1997-01-17 01.82 -5.0267 52.9100  3 -Z-
1997-03-26 01.80 -8.2300 46.5367  39 --P
1997-03-26 01.80 -8.2300 46.5367  39 -Z-
1997-03-26 06.02 -7.8050 47.4933  33 --P
1997-03-26 06.02 -7.8050 47.4933  33 -ZP
1997-03-26 10.23 -7.3700 48.4500  27 --P
1997-03-26 10.23 -7.3700 48.4500  27 -ZP
1997-03-26 14.47 -6.9283 49.4067  21 --P
1997-03-26 14.47 -6.9283 49.4067  21 -Z-
1997-03-26 18.72 -6.5267 50.3717  15 --P
1997-03-26 18.72 -6.5267 50.3717  15 -Z-
1997-03-26 23.02 -6.2150 51.3517  9 --P
1997-03-26 23.02 -6.2150 51.3517  9 -Z-
1997-03-27 03.40 -5.9200 52.3333  3 -Z-
1997-04-20 02.88 -8.2583 46.5700  39 -Z-
1997-04-20 08.15 -7.8183 47.5250  33 --P
1997-04-20 08.15 -7.8183 47.5250  33 -ZP
1997-04-20 13.42 -7.3717 48.4783  27 --P
1997-04-20 13.42 -7.3717 48.4783  27 -ZP
1997-04-20 18.68 -6.9167 49.4317  21 --P
1997-04-20 18.68 -6.9167 49.4317  21 -Z-
1997-04-20 23.52 -6.5217 50.3967  15 --P
1997-04-20 23.52 -6.5217 50.3967  15 -Z-
1997-04-21 03.70 -6.2283 51.3800  9 --P
1997-04-21 03.70 -6.2283 51.3800  9 -Z-
1997-04-21 07.82 -5.9400 52.3633  3 --P
1997-04-21 07.82 -5.9400 52.3633  3 -Z-
1997-05-17 22.30 -8.4000 46.2933  45 --P
1997-05-17 22.30 -8.4000 46.2933  45 -ZP
1997-05-18 02.68 -7.9683 47.2483  39 --P
1997-05-18 02.68 -7.9683 47.2483  39 -ZP
1997-05-18 07.08 -7.5283 48.2033  33 --P
1997-05-18 07.08 -7.5283 48.2033  33 -ZP
1997-05-18 11.48 -7.0800 49.1583  27 --P
1997-05-18 11.48 -7.0800 49.1583  27 -Z-
1997-05-18 15.87 -6.6217 50.1133  21 --P
1997-05-18 15.87 -6.6217 50.1133  21 -ZP
1997-05-18 20.27 -6.1550 51.0683  15 --P
1997-05-18 20.27 -6.1550 51.0683  15 -ZP
1997-05-19 00.68 -5.6467 52.0150  9 -Z-
1997-05-19 05.05 -5.3617 52.9267  3 --P
1997-05-19 05.05 -5.3617 52.9267  3 -Z-
1997-06-01 17.17 -8.2483 46.6733  39 --P
1997-06-01 17.17 -8.2483 46.6733  39 -ZP
1997-06-01 22.53 -7.6900 47.5700  33 --P
1997-06-01 22.53 -7.6900 47.5700  33 -ZP
1997-06-02 04.15 -6.9817 48.3450  27 --P
1997-06-02 04.15 -6.9817 48.3450  27 -Z-
1997-06-02 09.23 -6.7833 49.3350  21 --P
1997-06-02 09.23 -6.7833 49.3350  21 -ZP
1997-06-02 14.27 -6.5483 50.3233  15 --P
1997-06-02 14.27 -6.5483 50.3233  15 -Z-
1997-06-02 19.22 -6.2500 51.3050  9 --P
1997-06-02 19.22 -6.2500 51.3050  9 -Z-
1997-06-03 00.18 -5.9517 52.2883  3 -Z-
1997-06-29 14.93 -8.4017 46.2283  39 --P
1997-06-29 14.93 -8.4017 46.2283  39 -ZP
1997-06-29 19.80 -7.9683 47.1833  33 --P
1997-06-29 19.80 -7.9683 47.1833  33 -ZP
1997-06-30 00.67 -7.5267 48.1367  27 --P
1997-06-30 00.67 -7.5267 48.1367  27 -ZP
1997-06-30 05.53 -7.0767 49.0917  21 --P
1997-06-30 05.53 -7.0767 49.0917  21 -Z-
1997-06-30 10.42 -6.6233 50.0467  15 --P
1997-06-30 10.42 -6.6233 50.0467  15 -ZP
1997-06-30 15.38 -6.2917 51.0250  9 --P
1997-06-30 15.38 -6.2917 51.0250  9 -ZP
1997-06-30 20.35 -5.9533 52.0017  3 --P
1997-06-30 20.35 -5.9533 52.0017  3 -ZP
1997-07-27 00.43 -8.3717 46.2833  39 --P
1997-07-27 00.43 -8.3717 46.2833  39 -ZP
1997-07-27 05.22 -7.9400 47.2383  33 -Z-
1997-07-27 10.00 -7.5017 48.1933  27 --P
1997-07-27 10.00 -7.5017 48.1933  27 -ZP
1997-07-27 14.78 -7.0550 49.1483  21 --P
1997-07-27 14.78 -7.0550 49.1483  21 -Z-
1997-07-27 19.58 -6.5983 50.1033  15 --P
1997-07-27 19.58 -6.5983 50.1033  15 -Z-
1997-07-28 00.03 -6.2983 51.0850  9 -Z-
1997-07-28 04.50 -5.9917 52.0667  3 --P
1997-07-28 04.50 -5.9917 52.0667  3 -Z-
1997-09-07 05.87 -8.2733 46.5333  33 --P
1997-09-07 05.87 -8.2733 46.5333  33 -Z-
1997-09-07 10.23 -7.8333 47.4867  27 --P
1997-09-07 10.23 -7.8333 47.4867  27 -ZP
1997-09-07 14.58 -7.3850 48.4400  21 -Z-
1997-09-07 18.95 -6.9283 49.3933  15 -Z-
1997-09-08 00.12 -6.4817 50.3517  9 --P
1997-09-08 00.12 -6.4817 50.3517  9 -Z-
1997-09-08 06.65 -6.0600 51.3150  3 --P
1997-09-08 06.65 -6.0600 51.3150  3 -Z-
1997-10-05 02.92 -8.1783 46.8067  39 --P
1997-10-05 02.92 -8.1783 46.8067  39 -ZP
1997-10-05 07.40 -7.7317 47.7600  33 -Z-
1997-10-05 11.90 -7.2783 48.7133  27 --P
1997-10-05 11.90 -7.2783 48.7133  27 -Z-
1997-10-05 16.40 -6.8150 49.6650  21 -Z-
1997-10-05 21.45 -6.4483 50.6367  15 --P
1997-10-05 21.45 -6.4483 50.6367  15 -Z-
1997-10-06 02.82 -6.1417 51.6167  9 -Z-
1997-11-02 03.85 -8.2917 46.4533  39 -Z-
1997-11-02 13.33 -7.4333 48.3667  27 --P
1997-11-02 13.33 -7.4333 48.3667  27 -ZP
1997-11-02 18.08 -6.9917 49.3233  21 -Z-
1997-11-02 22.83 -6.5417 50.2800  15 -Z-
1997-11-03 03.57 -6.0833 51.2367  9 -Z-
1997-12-14 03.50 -8.0717 46.9867  27 --P
1997-12-14 08.05 -7.6400 47.9433  21 -Z-
1997-12-14 12.58 -7.2017 48.8983  15 --P
1997-12-14 12.58 -7.2017 48.8983  15 -Z-
1997-12-14 17.13 -6.7533 49.8550  9 -Z-
1997-12-14 21.68 -6.2967 50.8117  3 -Z-
1998-02-01 22.03 -8.3517 46.5667  39 --P
1998-02-01 22.03 -8.3517 46.5667  39 -ZP
1998-02-02 02.98 -7.9267 47.5233  33 -Z-
1998-02-02 07.93 -7.4950 48.4800  27 -Z-
1998-02-02 21.63 -6.3067 51.3783  9 -Z-
1998-02-03 01.75 -5.9600 52.3550  3 -Z-
1998-03-01 16.43 -8.2350 46.6850  39 --P
1998-03-01 16.43 -8.2350 46.6850  39 -ZP
1998-03-01 20.60 -7.7900 47.6383  33 --P
1998-03-01 20.60 -7.7900 47.6383  33 -Z-
1998-03-02 00.78 -7.3367 48.5917  27 --P
1998-03-02 00.78 -7.3367 48.5917  27 -Z-
1998-03-02 04.95 -6.8733 49.5433  21 -Z-
1998-03-02 09.40 -6.5000 50.5117  15 -Z-
1998-03-02 14.17 -6.2200 51.4967  9 --P
1998-03-02 14.17 -6.2200 51.4967  9 -Z-
1998-03-02 18.93 -5.9333 52.4800  3 --P
1998-03-29 10.65 -8.4600 46.2083  39 --P
1998-03-29 10.65 -8.4600 46.2083  39 -ZP
1998-03-29 15.05 -8.0167 47.1617  33 -Z-
1998-03-29 19.43 -7.5633 48.1133  27 -Z-
1998-03-29 23.83 -7.1033 49.0650  21 --P
1998-03-29 23.83 -7.1033 49.0650  21 -Z-
1998-03-30 04.23 -6.6333 50.0167  15 -Z-
1998-03-30 13.20 -6.0300 51.9800  3 --P
1998-03-30 13.20 -6.0300 51.9800  3 -Z-
1998-05-30 00.55 -5.4867 53.4633  3 -Z-
1998-05-30 04.70 -5.7417 52.4750  9 --P
1998-05-30 04.70 -5.7417 52.4750  9 -Z-
1998-05-30 09.02 -6.0650 51.4983  15 --P
1998-05-30 09.02 -6.0650 51.4983  15 -ZP
1998-05-30 14.45 -6.5633 50.5333  21 --P
1998-05-30 14.45 -6.5633 50.5333  21 -Z-
1998-05-30 19.23 -6.9750 49.5700  27 --P
1998-05-30 19.23 -6.9750 49.5700  27 -Z-
1998-05-31 00.12 -7.4283 48.6150  33 --P
1998-05-31 00.12 -7.4283 48.6150  33 -Z-
1998-05-31 05.02 -7.8717 47.6600  39 --P
1998-05-31 05.02 -7.8717 47.6600  39 -ZP
1998-05-31 09.90 -8.3067 46.7050  45 --P
1998-05-31 09.90 -8.3067 46.7050  45 -ZP
1998-06-27 00.62 -5.5500 53.1967  3 --P
1998-06-27 00.62 -5.5500 53.1967  3 -Z-
1998-06-27 04.95 -5.7983 52.2067  9 --P
1998-06-27 04.95 -5.7983 52.2067  9 -Z-
1998-06-27 09.82 -6.0000 51.2233  15 --P
1998-06-27 09.82 -6.0000 51.2233  15 -ZP
1998-07-24 22.67 -5.1750 52.9650  3 -Z-
1998-07-25 02.83 -5.7567 52.0300  9 --P
1998-07-25 02.83 -5.7567 52.0300  9 -Z-
1998-07-25 07.12 -6.2733 51.0850  15 --P
1998-07-25 07.12 -6.2733 51.0850  15 -ZP
1998-07-25 11.48 -6.7417 50.1300  21 --P
1998-07-25 11.48 -6.7417 50.1300  21 -ZP
1998-07-25 15.87 -7.2017 49.1750  27 --P
1998-07-25 15.87 -7.2017 49.1750  27 -ZP
1998-07-25 20.23 -7.6517 48.2200  33 --P
1998-07-25 20.23 -7.6517 48.2200  33 -ZP
1998-07-26 00.62 -8.0933 47.2667  39 --P
1998-07-26 00.62 -8.0933 47.2667  39 -ZP
1998-07-26 05.00 -8.5267 46.3117  45 --P
1998-07-26 05.00 -8.5267 46.3117  45 -ZP
1998-09-06 20.37 -5.6200 52.2900  9 --P
1998-09-06 20.37 -5.6200 52.2900  9 -ZP
1998-09-07 02.27 -6.0150 51.3317  15 --P
1998-09-07 02.27 -6.0150 51.3317  15 -ZP
1998-09-07 07.57 -6.0100 50.3317  21 --P
1998-09-07 07.57 -6.0100 50.3317  21 -ZP
1998-09-07 12.87 -6.0050 49.3317  27 -ZP
1998-09-07 18.13 -5.9517 48.3383  33 --P
1998-09-07 18.13 -5.9517 48.3383  33 -ZP
1998-09-07 22.97 -5.3883 47.4117  39 -Z-
1998-10-17 11.47 -5.9383 51.7733  9 -Z-
1998-10-17 15.90 -6.4117 50.8183  15 --P
1998-10-17 15.90 -6.4117 50.8183  15 -Z-
1998-10-17 20.35 -6.8767 49.8633  21 -Z-
1998-10-18 00.80 -7.3317 48.9083  27 -Z-
1998-10-18 05.23 -7.7783 47.9533  33 --P
1998-10-18 09.68 -8.2167 46.9983  39 --P
1998-10-18 09.68 -8.2167 46.9983  39 -ZP
1998-11-14 23.82 -5.8383 52.0417  9 -Z-
1998-11-15 04.30 -6.0000 51.0550  15 -Z-
1998-11-15 08.62 -6.0000 50.0550  21 -Z-
1998-11-15 12.95 -6.0000 49.0550  27 -Z-
1998-11-15 17.23 -5.8350 48.0717  33 -Z-
1998-11-15 21.50 -5.3850 47.1200  39 --P
1998-11-15 21.50 -5.3850 47.1200  39 -Z-
1998-11-16 01.77 -4.9433 46.1667  45 --P
1998-11-16 01.77 -4.9433 46.1667  45 -ZP
1998-12-13 00.25 -5.8567 51.9800  3 -Z-
1998-12-13 05.00 -6.3050 51.0217  9 -Z-
1998-12-13 09.77 -6.7733 50.0667  15 -Z-
1998-12-13 14.53 -7.2317 49.1117  21 -Z-
1998-12-13 19.30 -7.6817 48.1567  27 --P
1998-12-13 19.30 -7.6817 48.1567  27 -Z-
1998-12-14 00.08 -8.1217 47.2033  33 -ZP
1998-12-14 04.85 -8.5550 46.2483  39 -Z-
1999-01-18 17.73 -5.6283 52.8867  3 --P
1999-01-19 12.68 -6.8000 49.9850  21 -Z-
1999-01-19 18.77 -7.2517 49.0300  27 -Z-
1999-01-20 00.85 -7.6933 48.0733  33 --P
1999-01-20 00.85 -7.6933 48.0733  33 -Z-
1999-01-20 06.95 -8.1283 47.1183  39 -Z-
1999-02-13 10.43 -5.8883 51.8567  9 -Z-
1999-02-13 14.78 -6.3633 50.9017  15 -Z-
1999-02-13 19.13 -6.8300 49.9467  21 --P
1999-02-13 19.13 -6.8300 49.9467  21 -Z-
1999-02-13 23.50 -7.2850 48.9917  27 -Z-
1999-02-14 03.85 -7.7333 48.0367  33 --P
1999-02-14 03.85 -7.7333 48.0367  33 -ZP
1999-03-13 05.65 -5.6283 52.9250  3 --P
1999-03-13 10.17 -5.8667 51.9367  9 --P
1999-03-13 14.68 -6.3250 50.9783  15 -Z-
1999-03-13 19.20 -6.7917 50.0250  21 -Z-
1999-03-13 23.72 -7.2500 49.0700  27 -Z-
1999-03-14 04.23 -7.6983 48.1150  33 --P
1999-03-14 04.23 -7.6983 48.1150  33 -Z-
1999-03-14 13.27 -8.5717 46.2050  45 -Z-
1999-04-24 05.18 -5.7117 52.6167  3 --P
1999-04-24 05.18 -5.7117 52.6167  3 -Z-
1999-04-24 09.68 -5.9833 51.6317  9 --P
1999-04-24 09.68 -5.9833 51.6317  9 -Z-
1999-04-24 14.40 -5.9883 50.6317  15 --P
1999-04-24 14.40 -5.9883 50.6317  15 -Z-
1999-04-24 19.12 -5.9933 49.6317  21 --P
1999-04-24 19.12 -5.9933 49.6317  21 -Z-
1999-04-24 23.83 -5.9983 48.6317  27 --P
1999-04-24 23.83 -5.9983 48.6317  27 -ZP
1999-04-25 04.63 -5.6433 47.6683  33 --P
1999-04-25 04.63 -5.6433 47.6683  33 -Z-
1999-04-25 09.45 -5.1883 46.7183  39 --P
1999-04-25 09.45 -5.1883 46.7183  39 -ZP
1999-05-22 00.72 -5.5217 53.3617  3 --P
1999-05-22 00.72 -5.5217 53.3617  3 -Z-
1999-05-22 05.22 -5.7817 52.3733  9 --P
1999-05-22 09.63 -6.1367 51.4017  15 --P
1999-05-22 09.63 -6.1367 51.4017  15 -ZP
1999-05-22 13.95 -6.5983 50.4450  21 --P
1999-05-22 13.95 -6.5983 50.4450  21 -Z-
1999-05-22 18.28 -7.0500 49.4883  27 --P
1999-05-22 18.28 -7.0500 49.4883  27 -Z-
1999-05-22 22.60 -7.4933 48.5317  33 --P
1999-05-22 22.60 -7.4933 48.5317  33 -Z-
1999-05-23 02.93 -7.9283 47.5750  39 --P
1999-05-23 02.93 -7.9283 47.5750  39 -Z-
1999-05-23 07.25 -8.3550 46.6183  45 --P
1999-05-23 07.25 -8.3550 46.6183  45 -ZP
1999-06-19 01.53 -5.6800 52.7633  3 -Z-
1999-06-19 05.70 -5.9450 51.7783  9 --P
1999-06-19 05.70 -5.9450 51.7783  9 -Z-
1999-06-19 09.98 -6.4150 50.8233  15 --P
1999-06-19 09.98 -6.4150 50.8233  15 -Z-
1999-06-19 14.27 -6.8767 49.8667  21 --P
1999-06-19 14.27 -6.8767 49.8667  21 -ZP
1999-06-19 18.55 -7.3300 48.9117  27 --P
1999-06-19 18.55 -7.3300 48.9117  27 -ZP
1999-06-19 22.83 -7.7733 47.9567  33 --P
1999-06-19 22.83 -7.7733 47.9567  33 -ZP
1999-06-20 03.13 -8.2083 47.0017  39 --P
1999-06-20 03.13 -8.2083 47.0017  39 -Z-
1999-06-20 07.42 -8.6367 46.0450  45 --P
1999-06-20 07.42 -8.6367 46.0450  45 -ZP
1999-07-17 00.75 -5.5150 53.3467  3 --P
1999-07-17 00.75 -5.5150 53.3467  3 -Z-
1999-07-17 04.80 -5.7633 52.3583  9 --P
1999-07-17 04.80 -5.7633 52.3583  9 -Z-
1999-07-17 09.00 -6.1200 51.3850  15 --P
1999-07-17 09.00 -6.1200 51.3850  15 -Z-
1999-07-17 13.37 -6.5800 50.4283  21 --P
1999-07-17 13.37 -6.5800 50.4283  21 -Z-
1999-07-17 17.72 -7.0333 49.4717  27 --P
1999-07-17 22.08 -7.4767 48.5150  33 --P
1999-07-17 22.08 -7.4767 48.5150  33 -Z-
1999-07-18 02.45 -7.9117 47.5600  39 --P
1999-07-18 02.45 -7.9117 47.5600  39 -ZP
1999-07-18 06.82 -8.3383 46.6033  45 --P
1999-08-14 01.30 -5.5800 53.1100  3 -Z-
1999-08-14 05.12 -5.8217 52.1217  9 --P
1999-08-14 05.12 -5.8217 52.1217  9 -ZP
1999-08-14 09.38 -6.2367 51.1583  15 --P
1999-08-14 09.38 -6.2367 51.1583  15 -Z-
1999-08-14 13.80 -6.7050 50.2033  21 --P
1999-08-14 13.80 -6.7050 50.2033  21 -ZP
1999-08-14 18.23 -7.1650 49.2483  27 --P
1999-08-14 18.23 -7.1650 49.2483  27 -ZP
1999-08-14 22.65 -7.6150 48.2933  33 --P
1999-08-14 22.65 -7.6150 48.2933  33 -ZP
1999-08-15 03.08 -8.0567 47.3383  39 -ZP
1999-09-11 01.80 -5.5183 53.3800  3 -Z-
1999-09-11 06.25 -5.7683 52.3900  9 --P
1999-09-11 06.25 -5.7683 52.3900  9 -ZP
1999-09-11 10.95 -6.0017 51.4050  15 -Z-
1999-09-11 15.37 -6.0067 50.4050  21 -Z-
1999-09-11 19.77 -6.0117 49.4050  27 --P
1999-09-11 19.77 -6.0117 49.4050  27 -Z-
1999-09-12 00.20 -6.0117 48.4050  33 --P
1999-09-12 00.20 -6.0117 48.4050  33 -Z-
1999-09-12 05.73 -5.5617 47.4517  39 -Z-
1999-09-12 11.28 -5.1200 46.4983  45 --P
1999-09-12 11.28 -5.1200 46.4983  45 -ZP
1999-10-09 11.63 -5.8833 51.9617  9 --P
1999-10-09 11.63 -5.8833 51.9617  9 -Z-
1999-10-09 16.23 -6.3350 51.0033  15 -Z-
1999-10-09 20.77 -6.8067 50.0483  21 -Z-
1999-10-10 01.30 -7.2683 49.0950  27 -Z-
1999-10-10 05.83 -7.7200 48.1417  33 --P
1999-10-10 05.83 -7.7200 48.1417  33 -ZP
1999-10-10 10.35 -8.1650 47.1867  39 --P
1999-11-07 06.08 -5.4317 52.5917  3 -Z-
1999-11-07 10.95 -5.9817 51.6517  9 --P
1999-11-07 10.95 -5.9817 51.6517  9 -Z-
1999-11-07 15.55 -6.4633 50.6983  15 -Z-
1999-11-07 20.13 -6.9367 49.7450  21 --P
1999-11-07 20.13 -6.9367 49.7450  21 -ZP
1999-11-08 00.73 -7.4000 48.7917  27 --P
1999-11-08 00.73 -7.4000 48.7917  27 -ZP
1999-11-08 05.33 -7.8533 47.8383  33 --P
1999-11-08 05.33 -7.8533 47.8383  33 -ZP
1999-11-08 09.93 -8.3000 46.8867  39 --P
1999-11-08 09.93 -8.3000 46.8867  39 -ZP
1999-12-18 15.73 -5.6500 52.9017  3 -Z-
1999-12-18 20.20 -5.8733 51.9117  9 -Z-
1999-12-19 00.73 -6.3400 50.9550  15 --P
1999-12-19 00.73 -6.3400 50.9550  15 -Z-
1999-12-19 05.25 -6.8067 50.0017  21 -Z-
1999-12-19 09.77 -7.2667 49.0467  27 -Z-
1999-12-19 14.30 -7.7167 48.0933  33 -Z-
1999-12-19 18.82 -8.1583 47.1383  39 --P
1999-12-19 18.82 -8.1583 47.1383  39 -Z-
Sub-Collection:   North Atlantic CPR sample data. COPEPOD
https://www.st.nmfs.noaa.gov/copepod
Web v10.1   [ 2010-Dec ]